January 13, 2006
Brian 1. Dench, P.E.
Pate Engineers
8150 Brookriver Drive, Suite S-700
Dallas, TX 75247
RE: Vista Point 11, Lot 4, Block A (Service Star Garage)
Fee Assessment Letter
Dear Mr. Dench:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City ofCoppell in the amount of$7,132.75 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas
Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the
issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning ("If this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
c~a~a,~
Graduate Engineer
cc: Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
55 f-'AR~;WAY * PO l30X 9478 * COPPELL TX 1501~ * lEL 972'4620022 * I'AX 972/304 3673
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
o
o
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Ligbting Fees:
Assessed for lighting in the City's right-of-way.
ThiS fee cannot be assessed until after T.U. ElectriC submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost reqUired for private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
$0.00
$7,132.75
Information not Available
Information not Available
Information not Available
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Vista Point II, Lot 4, Block A (Service Star Garage)
1/12/2005
ROADWAY IMPACT FEE:
Service Area * I
Category ** Retail/Commercial
Land Use * * Commercial Others Not Snecified
Building Area (sf) 6,004
Dt:velopment Units ** 6.00
Vehicle Miles per Development Unit ** 7.92
Fee per Vehicle Mile *** $150
Roadway Impact Fee due ~ (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) ~ $7,132.75
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
AMOUNT DUE:
$7,132.75 I