Loading...
Service Star-CS060113 THE CITY.OF corrELL .~",'~~\~ ~\' "'-("J;~"-:.y"/:.:? """~'." ....'T..' ,;1;.~ ....'.~..J '" 1~ "', - "_-~"'''''-/ '--'::<"~"'!4 -, f '-. 2~-; ".,- ~,~';~~.;.. \.') r-"'-;',--" ~~, C\ )( ...- ':- 'D i\ (; \ January 13, 2006 Brian 1. Dench, P.E. Pate Engineers 8150 Brookriver Drive, Suite S-700 Dallas, TX 75247 RE: Vista Point 11, Lot 4, Block A (Service Star Garage) Fee Assessment Letter Dear Mr. Dench: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City ofCoppell in the amount of$7,132.75 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning ("If this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, c~a~a,~ Graduate Engineer cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation 55 f-'AR~;WAY * PO l30X 9478 * COPPELL TX 1501~ * lEL 972'4620022 * I'AX 972/304 3673 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 o o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Ligbting Fees: Assessed for lighting in the City's right-of-way. ThiS fee cannot be assessed until after T.U. ElectriC submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost reqUired for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $7,132.75 Information not Available Information not Available Information not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Vista Point II, Lot 4, Block A (Service Star Garage) 1/12/2005 ROADWAY IMPACT FEE: Service Area * I Category ** Retail/Commercial Land Use * * Commercial Others Not Snecified Building Area (sf) 6,004 Dt:velopment Units ** 6.00 Vehicle Miles per Development Unit ** 7.92 Fee per Vehicle Mile *** $150 Roadway Impact Fee due ~ (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) ~ $7,132.75 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) AMOUNT DUE: $7,132.75 I