Loading...
ST9902-LR061218 In-Place Soil Moisture/Density Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppell Project: West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-203 Report Date: 12/18/2006 Specifications Percent Compaction: +95% min Moisture Content: opt -2% to +4% Test Data Date Tested: 12/12/2006 Technician: Josh Bridges 3063 Test Method ASTM D-698 Material Description Brown and Light Brown Sandy Clay (Cement Treated) Optimum Maximum Dry Moisture % Density pcf 17.0 101.5 Curve No. In-Place Test Results Test Elevation Ref. Probe No or Lift Location Curve Depth Paving Subgrade ** 311.0 Final 5' East, 10' North of SW Corner of Cutout 3063 6" 312.0 Final 10' North, 10' West of SE Comer of Cutout 3063 6" 313.0 Final 15' South, 5' East of NW Comer of Cutout 3063 6" Percent Moisture Wet Density Dry Density (pct) (pct) 16.4 17.4 16.5 105.9 91.0 105.9 90.2 111.1 95.4 An asterisk (*) appears next to test results which do NOT meet the project specifications. / Test Method(s): ASTM D2922, ASTM D3017 Additional Remark(s): * Non-Compliant: John Gay with Tiseo Paving Company was Notl ** Paving Subgrade: 15x10 paving cutout at the SE corner of r} rZ/t 1; t' if Gauge SN: 5000 Std. Density Count: 3726 R. Carl Lee, S.E.T. Vice President/CMT Manager CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1