Loading...
SS9901-CS050711TCB I AECOM Turner Collie & Braden 17300 Dallas Parkway, Suite 1010, Dallas, Texas 75248 T 972.735.3000 F 972.735.3001 www,tcb.aecom.com July 11, 2006 Mr. Charles Ferrara President Can -Fer Construction Company 11031 Grissom Lane Dallas, TX 75229 Subject: Change Order Proposal 0010 Sandy Lake Lift Station Unit Heaters Dear Mr. Ferrara: We have reviewed the change order you provided to the City for the following work: 1. Remove the three (3) 240 volt unit heaters that have been installed. 2. Send two (2) of the 240 volt unit heaters to the heater manufacturer to be reconfigured to 480 volt units. Turn the other three (3) heaters over to the City. Additional information is required before we can recommend acceptance of this change order. Please provide documentation for the prices provided for freight and reconfiguration of the heaters by Indeeco. This is more than what was indicated to TCB by the heater supplier (Bartos Industries). Also, the change order includes $500 for subcontractor professional services. Please describe how these services are required and provide substantiating documentation. Finally, the change order includes $1,406 for 20 hours of labor plus the subcontractor effort to remove the three (3) heaters (not including general condition materials or mark -ups for insurance, overhead and profit). This amount of labor seems excessive for simply removing the heaters. Please provide some explanation for this cost. The requested information should be submitted to TCB. We will pass the information along to the City after it has been reviewed. Please feel free to contact me at 972 - 735 -3056 if you have any questions regarding this request. Sincerely, Erika K. Cooper, P.E. Project Manager c: Mr. Kenneth M. Griffin, P.E. — City of Coppell File