Loading...
SS9901-CS060706From:GATEPY BANK -14 619 0270 214 619 0270 11031 Grissom Lane Dallas, Texas 75229 972.484.4344 telephone 972.484.4223 fax FACSIM-ILE TRANSMITTAL I-- S To; rr. I �_ .'1., Fax: "1 f / , I I d Attn: From: Re: n7 /nn /?006 13:33 #277 P.001/004 Date: C,.- ,pages: L�J 570 ❑ Urgent ❑ For Review [] Please Comment ❑ Please Reply ❑ Please Recycle G�z CONSTRUCTION COMPANY Building a solid foundation for a brighter future. Frnm:GATEWAY BAND. 14 610 0270 Turner Collie & Braden 1730C Da'las Parkr:ay. Su to 10' C Da Ias, -exas 75248 972.73 3000 F 972 73`.:i30' ...ti.• , b aecoT.ccm l June 21, 2006 Mr. Charles Ferrara President Can -Fer Construction Company 11031 Grissom Lane Dallas, TX 75229 07/1 13:4 #277 P.002/004 TCB I AECOM Subject: Sandy Lake Lift Station Unit Heaters Pricing Request Dear Mr. Ferrara: Please provide pricing information for the following items at the Sandy Lake Lift Station: 1. Remove the three (3) 240 volt unit heaters that have been Installed. 2. Send two (2) of the 240 volt unit heaters to the heater manufacturer to be reconfigured to 480 volt units. Turn the other three (3) heaters over to the City. 3. Install the two (2) reconfigured unit heaters. TCB has contacted Randy Wieker at Bartos Industries (214 -350 -6871 ext 124) to discuss the reconfiguratlon of the heaters. Mr. Wieker In turn contacted Indeeco (heater manufacturer) to discuss the cost for reconfiguration of the units According to Indeeco, the cost to reconfigure one heater (Including freight to and from the factory) is approximately $1,600. Contact Mr_ Wieker to confirm the pricing and discuss the method for shipping the heaters to the Indeeco factory. We will provide the submitted pricing information to the City for their review and approval. Please feel free to contact me at 972 -735 -3056 if you have any questions regarding this request. S incerely, Erika K. Cooper, E_ Project Manager c- Mr. Kenneth M. Griffin, P.E — City of Copped Mr. Rick O'Dell — City of Coppeli File From : GATEWAY BANE: Serial Letter No. Contract No. SS 99 -01 14 Fi I9 0270 071/ 13:34 #277 P.003/004 Change Order Proposal -0010 Deforest Rd. a Sandy Lake Rd. Lift Station Improvements Date: July 7,2006 Work Description: Remove the three(3) 240 volt unit heaters that have been Installed(See TGB letter dated June 21.2006.) Engineer: TurnerCollie &Braden 17300 Dallas Parkway Suite 1010 Dallas,TX 75248 Contractor: CAN -FER Construction Company 11031 Grlesom Lane Dallas,TX 76229 Labor Material Equipment Subcontractor TOTALS: $ 906.00 $ 3,790.26 $ - S 600.00 $5,196.28 $72.75 CAN -FER In9uranW 1.4% $3,268.09 Subtotal Overhead(Home Office) - 8.5% Subcontracted Work $447.87 $5,716.88 Subtotal Profit Subcontracted Work 6.0% $343.01 Subtotal $6,039.89 Overhead(Home Office) - 8.5 %Self Performed Work $0.00 $0 Subtotal Proft-12% Self Performed $0.00 Subtotal $6.059.89 Subtotal Bond 1.6% $96.96 3$ 166.86 Total * ** day time extension. * ** From: GATEWAY BANS:. 14 61q i r` �i 0 7, /� fir,+ rink 13:: -1 4 #2i'? P.004 '004 WorK Desaiptlom Remove the three (3) 240 volt unft heaters that have been tnstalled {See TCe letter dated T RIAL RT HR8 UNIT RT RA a OT TE TOTAL LABOR Project Manager 4 0 MH Soo $4b,00 $ 180.00 Superintendent @ 0 MH $37.50 $87.60 $ 300.00 Craft $u 0 D MH $33.76 33.75 $ TOlal 0 0 MH $26.00 $37.50 $ Foremen 4 0 MH $16.00 $27.00 $ 72.00 Car Hier 0 0 MH 22.00 $3100 Q eralor- crane 0 0 MH $17.00 $25.50 T OTAL Operator 0 0 MH $18.00 27.00 - PI a Lover 4 0 MH $12.00 sis.00 48.00 Leborer I 0 0 MH 22 -00 $33.00 5 Plaid Engineer 0 0 MH $18,00 Fleld Engineer A$ft. D 0 MN 13 00 622,b0 $ Rodman QTY UNIT UNIT PRICE $ 800.00 subtotal t LS 20.84 $ 258.00 Labor Burden 43% 1 LS $ 19 93 $ 48.00 Frin a Benefits 8% 1 LS 9.97 805.00 Total labor 1 4s s 0.91 $ 54.36 T RIAL QTY UNIT UNIT PRI TOTAL 2 L8 S200006 0.00 400.00 Frei ht 2 L8 $1 $ Indeeco 0 00 $000 $ TOlal q so.DO bt tel - Eaul ment $0.00 $ Fuel 011 Oeas9 35% of E ui Taut 8.25% 3,W0.010 Subtotal . Non -Taxed Material Total Equipment I TAXED MATERIAL CITY UNIT UNIT PRICE T OTAL p $697.00 $ 0 $0.00 p $0.00 q 10.00 Subtotal - Taxed Materiel + 8.25% Tax TOTAL GBNEKA6 C00MON MATEPIAL QTY UNIT UNIT PRICE 20.84 iggg ite Trellar 2.3 Labor t LS 20.84 19,98 obehe Phone 22% Labor 1 LS $ 19 93 Jobefte Electric 1.1% Labor 1 LS 9.97 S Jabelte Water 0.1% Labor 1 4s s 0.91 $ 54.36 Small Tools 6% Labor 1 34.36 3.82 General Cie 1 L LS 162 s 8.34 6.34 Dum r emmro Tolleta 0.6% Labor 1 t LS 8 6 3.44 Sol E u1 ment 3% Labor t LS $ 27,141 27.18 Plcku Trucks 3% Labor 1 LS $ 27.18 27.18 190.26 Subtotal - G C Materlal + 8.25 % Tax)$ Total Materiel 3,790.25 FsMENT QTY1 0 UNIT KATE 90.00 TOTAL 0 0 L8 0.00 - 01 0 L8 .00 0 00 $0.00 S TOlal so.DO bt tel - Eaul ment 500.00 Fuel 011 Oeas9 35% of E ui Taut 8.25% 3 $ Total Equipment I &tjBQQNTFtACT0A rye QTY 1 UNIT LS UNIT PRICE $ TOTAL 300.00 L8 - 0 L8 0 Ls $0.00 S TOlal 500.00 HP Lased 3330 HP LASERJET 3200 Jul -6 -2006 1:54PM i n v e n t Fax Call Report Job Date Time Type Identification Duration Pages Result 630 71 6/2006 1:53:09PM Send 9727353001 1:01 3 OK FrOm:GATEWAY BAN( 2:4 619 0270 07/06/2006 13:34 #277 P.002/004 TCB AECOI RAW - 7/1 Tumor Co11N a aradan 173CC Gallas P.' -,,, S�,,, ':. t c. Da'las. -­11 1 5248 I 972.738.3CDC e972.73E IOCI ­,t aec�n.ccm t June 21, 2006 , ( C � Mr. Charles Ferrara a President Can -For Construction Company 11031 Gnasom Lana Dodos. Tx 75229 Subject: Sandy Lake Lift Station Unit HeeteM Pricing Request Dear Mr. Ferrara: Plea" provide priclrg Information for the following items at the Sandy Lake Lift Station - 1. Remove the three (3) 240 volt unit heaters that have been Installed. 2. Send two (2) of the 240 volt unit heaters to the heater manufacturer to be reconfigured to 480 volt units. Turn the other three (3) heaters over to the City. 3. Inalall the Iwo (2) reconfigured uld healers. TCB has contacted Randy W Ieker at Bartos Industries (274 - 330.6871 exl 124) to discuss the reconfiguretlon of the heaters Mr. Walter In turn contorted Indeeco (hooter manufacturer) to dlaCUss the coat for reconfiguration of the units. According to Indeeco, the cost to record one healer (including freight to and from the factory) is 8PPtoximately 51,800. Contact Mr. Wieker to confirm the Pricing and discuss the method for shipping the heaters to the Incleaco factory . We W41 provide the submitted pricing Information to the City for their review and approval. Please feel free 10 con,act me at 972- 7333056 a you have any questions regarding this request. Sincerely, /`,.r -�� En�P Pmjact Manager c'. Mr. Kenneth M, Griffin, RE - Cily of Coppell Mr. Rick UDeli -City of COpt3e11 File