Gateway BP(1.4)-LR061209ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings Approved
X
Bar Length and Shape
X
Column Tie Spacing Type
Bar Size
X
Proper Bar Placement
X
Stirrup Spacing Type
Bar Grade
X
Properly Tied
X
Welded Splices
Rebar Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash Debris Removed
X
Proper Bar Supports
X
Lapped Splices
X
Number of Bars
X
Proper Cover /Clearance
X
REPORT OF REINFORCING STEEL OBSERVATION
Date of Service:
Client No.:
Client:
Services:
Drawings Utilized:
Locations /Items Observed: Paving, refer to attached sketch
Test Method:
Field Results Report To:
Technician: J. Rojas
Report Distribution:
(1) Hill Wilkinson LTD
(1) Halff Assoc Inc
(1) City of Coppell TX
12/09/06
72873
Hill Wilkinson LTD
800 Klein Rd Ste 100
Plano, TX 75074
Visual Observation
(1) Haverty Furniture Co Inc
Report No.:
Project No.:
Project:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Civil C2.01/C2.01, dated 10/03/06
REPORT OF OBSERVATION
Discrepancies/Comments: No discrepancies were noted prior to completion of this observation.
lierracon
Consulting Engineers Scientists
8901 Carpenter Frwy., Suite 9 100
Dallas, Texas 75247
(2141 630-1010
94061357.0023
94061357
Haverty Pavement Expansion
770 Gateway Blvd.
Coppell, TX
Hussein H. Abusaad, P.E.
Senior Project Manager
309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.
R DOWELING
EXISTING
..:_;.----....-....-->:,-.---....--,„...„......---............,........_..........................—................J.....—.-. 0/...*F.,,,°,..--,,,,..TVP....,,-.-...„ 7,
N PAVEMENT.
?.e 0 ...i "...1";
N.,...'"
CUT 874 LF REMOVE CURB
NECT TO EXIST. CONCRETE
1_
Terracon Report No.
94061357.0023
Dated 12/09/2006
Haverty Pavement Expansion
Civil C2.01, dated 10/03/06
(#3 18" OCEW)
75'
RESTRIPE FIRE LANE
15