Loading...
Gateway BP(1.4)-LR061209ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing Type Bar Size X Proper Bar Placement X Stirrup Spacing Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X REPORT OF REINFORCING STEEL OBSERVATION Date of Service: Client No.: Client: Services: Drawings Utilized: Locations /Items Observed: Paving, refer to attached sketch Test Method: Field Results Report To: Technician: J. Rojas Report Distribution: (1) Hill Wilkinson LTD (1) Halff Assoc Inc (1) City of Coppell TX 12/09/06 72873 Hill Wilkinson LTD 800 Klein Rd Ste 100 Plano, TX 75074 Visual Observation (1) Haverty Furniture Co Inc Report No.: Project No.: Project: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Civil C2.01/C2.01, dated 10/03/06 REPORT OF OBSERVATION Discrepancies/Comments: No discrepancies were noted prior to completion of this observation. lierracon Consulting Engineers Scientists 8901 Carpenter Frwy., Suite 9 100 Dallas, Texas 75247 (2141 630-1010 94061357.0023 94061357 Haverty Pavement Expansion 770 Gateway Blvd. Coppell, TX Hussein H. Abusaad, P.E. Senior Project Manager 309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon. R DOWELING EXISTING ..:_;.----....-....-->:,-.---....--,„...„......---............,........_..........................—................J.....—.-. 0/...*F.,,,°,..--,,,,..TVP....,,-.-...„ 7, N PAVEMENT. ?.e 0 ...i "...1"; N.,...'" CUT 874 LF REMOVE CURB NECT TO EXIST. CONCRETE 1_ Terracon Report No. 94061357.0023 Dated 12/09/2006 Haverty Pavement Expansion Civil C2.01, dated 10/03/06 (#3 18" OCEW) 75' RESTRIPE FIRE LANE 15