Loading...
SW0001-MP011024 RIVERCHASE SIDEWALK SW 00-01 PACHECO KOCH ENGINEERING Qtr 3, 2001 1 Qtr 4, 2001 ID Task Name Jun Jul Aug Sep Oct Nov 1 DESIGN PHASE 2 Design E :.......:::... 3 Advertisement 4 Bid Opening 5 City Council 6 RIGHT -OF -WAY 7 City of Irving 1- 8 Response Received . 10/10 9 Dallas Water Utilities 10 TXU Electric 11 Response Received . 10109 12 Lot 11 River Ridge Add. 13 HOA River Ridge Add. 14 CONSTRUCTION 15 Notice to Proceed 16 Construction Project: SW 00-01 Task 1 1 Milestone . Summary Deadline 4, Date: Wed 10/24/01 Page 1 RIVERCHASE SIDEWALK SW OD-M PACHECO KOCH ENGINEERING 2 Design ►Nsy need to be redesigned to avoid oonfllct with TXU taremission Ikm. Wkxiang with TXU to resobe issue. I Response Received Requested that portion of sidewalk within easement be redesigned. 11 Response Received Denied request for use of right -of -way. Page 2