Loading...
Vista Point 2R-LR061213 REED i EnGInEERinG I I GEOTECHNICAL AND 'I G R 0 U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Cappel!, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 76 REPORT DATE: 12-13-06 REG PROJECT NO. 13581 DATE OBSERVED: 12-05-06 TECHNICIAN: G. Green PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Parking for Buildings 5 and 6. I Reference Plans or Notes Used: I Sheet C8.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . F.AX [214J 3500019