Gateway BP(1.6)-LR061214CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94061163.0160
l~~rracon
Service Date: November 15, 2006 8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste 200 Goppell, TX
Dallas TX 75234
Project No.: 94061163
Material Information
Specified Strength: 3500 psi ~ 28 Days
Batch Time: 4:05am Plant: 66
Supplier: Southern Star
Truck No: 8002 Ticket No: 1356853
Mix I.D. No.: 9339
Water Added Onsite Before Test: 5 Gallons
Water Added Onsite After Test: -Gallons
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Temperature, °F:
Ambient Temperature,~F:
Plastic Unit Weight, pcf:
Result
5.00
4.8
68
58
144.6
Laboratory Test Data
Set Specimen Diameter Area
No. ID (inches) (sq. inches)
1 1 6.00 28.27
1 2 6.00 28.27
1 3 6.00 28.27
1 4 6.00 28.27
Sample Information
Date Cast: November 15, 2006 Time: 4:31am
Sampled by: Jose A. Martinez
Weather Conditions: Clear, windy
Accumulative Yards: 20
Placement Method: Pump
Sample Locations: See attached sketch for Location #1
Placement Location: Pavement W of Building
Specification
3-5
3-6
Test Method
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Date Test Load Strength
Tested (days) (Ibs) (psi)
11/22/2006 7 113,560 4,020
11 /22/200fi 7 111,410 3,940
Average (7 Days) 3,980
12/13/2006 28 148,270 5,240
12/13/2006 28 133,270 4,710
Average (28 Days) 4,980
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were pertormed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the. use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 7 ovncsraoi-FU„~e Key
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94061163.0160
11~rracon
Service Date: November 15, 2006 8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste 200 Coppell, TX
Datlas TX 75234
Project No.: 94061163
Material Information Sample Information
Specified Strength: 3500 psi ~ 28 Days Date Cast: November 15, 2006 Time: 5:35am
Sampled by: Jose A. Martinez
Batch Time: 4:39am Plant: 66 Weather Conditions: Clear, windy
Supplier: Southern Star Accumulative Yards: 110
Truck No: 3442 Ticket No: 1356869 Placement Method: Pump
Mix I.D. No.: 9339 Sample Locations: See attached sketch for Location #2
Water Added Onsite Before Test: 10 Gallons Placement Location: Pavement W of Building
Water Added Onsite After Test: -Gallons
Field Test Data
Test Result S pecification Test Method
Slump, inches: 6.25 3-5 ASTM C143
Air Content, %: 4.6 3-6 ASTM C231
Concrete Temperature, °F: 66 ASTM C1064
Ambient Temperature,aF: 54 ASTM C1064
Plastic Unit Weight, pcf: 142.7 ASTM C138
* =Field Test Results do not meet project specifications
Laboratory Test Data .
Age at Maximum Compressive
Set Specimen Diameter Area Date Test Load Strength
No. ID (inches) (s .inches) Tested (days) (Ibs} (psi)
2 1 6.00 28.27 11/22/2006 7 100,270 3,550
2 2 6.00 28.27 11/22/2006 7 100,650 3,560
Average (7 Days} 3,560
2 3 6.00 28.27 12/13/2006 28 135,970 4,810
2 4 6.00 28.27 12/13/2006 28 134,800 4,770
Average (28 Days) 4,790
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were performed in general accordance with applicable ASTM; AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the locations} referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 2 of 7 ObACS/R01fWre Key
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94061163.0160
11~rr~con
8901 Carpenter Fnnry, Ste #100
Service Date: November 15, 2006 Dallas, Texas 75247
(214) 630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste Z00 Coppell, TX
Dallas TX 75234
Project No.: 94061163
Material Information
Specified Strength: 3500 psi @ 28 Days
Batch Time: 5:42 Plant: 66
Supplier: Southern Star
Truck No: 1097 Ticket No: 1461960
Mix I.D. No.: 9339
Water Added Onsite Before Test: -Gallons
Water Added Onsite After Test: -Gallons
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Temperature, °F
Ambient Temperature,~F:
Plastic Unit Weight, pcf:
Result
5.50
3.0
70
51
146.3
Samale Information
Date Cast: November 15, 2006 Time: 6:32am
Sampled by: Jose A. Martinez
Weather Conditions: Clear, windy
Accumulative Yards: 110
Placement Method: Pump
Sample Locations: See attached sketch for Location #3
Placement Location: Pavement W of Building
Specification Test Method
3-5 ASTM C143
3-6 ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
" =Field Test Results do not meet project specifications.
Laboratory Test Data Age at Maximum Compressive
Set Specimen Diameter Area Date Test Load Strength
No. ID (inches) (s .inches) Tested (days) (Ibs) (psi)
3 1 6.00 28.27 11/22/2006 7 99,290 3,510
3 2 6.00 28.27 11 /22/2006 7 101,890 3,600
Average (7 Days) 3,560
3 3 6.00 28,27 12/13/2006 28 137,590 4,870
3 4 6.00 28.27 12/13/2006 28 142,530 5,040
Average (28 Days) 4,960
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests-were performed in general Hccordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use. of the client. __
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 3 of 7 Ot-ACSIROt-FUlure Key
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94061163.0160
l~~rracon
Service Date: November 15, 2006 8901 Carpenter Frvvy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste 200 Coppell, TX
Dallas TX 75234
Project No.: 94061163
Material Information
Specified Strength: 3500 psi ~ 28 Days
Batch Time: 6:15am Plant: 66
Supplier: Southern Star
Truck No: 1097 Ticket No: 1461970
Mix I.D. No.: 9339
Water Added Onsite Before Test: -Gallons
Water Added Onsite After Test: -Gallons
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Temperature, °F:
Ambient Temperature,°F:
Plastic Unit Weight, pcf:
Result
6.25
3.2
69
51
144.4
Samale Information
Date Cast: November 15, 2006 Time: 7:28am
Sampled by: Jose A. Martinez
Weather Conditions: Cloudy, windy
Accumulative Yards: 320
Placement Method: Pump
Sample Locations: See attached sketch for Location #4
Placement Location: Pavement W of Building
Specification
3-5
3-6
Test Method
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
" =Field Test Results do not meet project specifications.
Laboratory Test Data Age at Maximum Compressive
Set Specimen Diameter Area Date Test Load Strength
No, ID inches) (sq, inches) Tested da s) (Ibs) (psi)
4 1 6.00 28.27 11/22/2006 7 95,020 3,360
4 2 6.00 28.27 11/22/2006 7 86,540 3,060
Average (7 Days) 3,210
4 3 6.00 28.27 12/13/2006 28 129,350 4,570
4 4 6.00 28.27 12/13/2006 28 130,900 4,630
Average (28 Days) 4,600
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The testswere pertormed in general accordance with applicable ASTM, AASHTO, or DOT test methods.- This report is exclusively forthe use of-the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 4 of 7 o+-ACS~rro+f~w.x<Y
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94061163.0160
l~~rr~con
Service Date: November 15, 2006 8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste 200 Coppell, TX
Dallas TX 75234
Project No.: 94061163
Material Information
Specified Strength: 3500 psi ~ 28 Days
Batch Time: 8:32am Plant: 66
Supplier: Southern Star
Truck No: 1020 Ticket No: 1461983
Mix I.D. No.: 9339
Water Added Onsite Before Test: -Gallons
Water Added Onsite After Test: -Gallons
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Temperature, of
Ambient Temperature,~F
Plastic Unit Weight, pcf:
Result
5.25
3.1
66
45
146.4
Sample Information
Date Cast: November 15, 2006 Time: 8:57am
Sampled by: Jose A. Martinez
Weather Conditions: Light rain, cloudy, windy
Accumulative Yards: 430
Placement Method: Pump
Sample Locations: See attached sketch for Location #5
Placement Location: Pavement W of Building
Specification
3-5
3-6
Test Method
ASTM C143
ASTM C231
ASTM C 1064
ASTM C 1064
ASTM C138
" =Field Test Results do not meet project specifications.
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Diameter Area Date Test Load Strength
No. ID {inches) (sq. inches) Tested (days) (1bs) (psi)
5 1 6.00 28.27 11/22/2006 7 107,340 3,800
5 2 6.00 28.27 11/22/2006 7 100,080 3,540
Average (7 Days) 3,670
5 3 6.00 28.27 12/13/2006 28 141,500 5,000
5 4 6.00 28.27 12/13/2006 28 145,200 5,130
Average (28 Days) 5,070
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
-The tests were pertormed irrgeheral accordance with applicable ASTM, AASHTO, or 00T test methods. This report is exclusively for the use of#he client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 5 of 7 ot-ncsrtaoi-Fwa H.y
CONCRETE COMPRESSIVE STRENGTH TEST
rt N b 94061163 0160
l~~rracon
Repo um er.
Service Date: November 15, 2006 8901 Carpenter Fnnry, Ste #100
Dallas, Texas 75247
(214)630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste 200 Coppell, TX
Dallas TX 75234
Project No.: 94061163
Material Information
Specified Strength: 3500 psi cLD 28 Days
Batch Time: 9:14am Plant: 66
Supplier: Southern Star
Truck No: 3338 Ticket No: 1356911
Mix I.D. No.: 9339
Water Added Onsite Before Test: -Gallons
Water Added Onsite After Test: -Gallons
Field Test Data
Test Result
Slump, inches: 6.00
Air Content, %: 5.5
Concrete Temperature, ~F: 61
Ambient Temperature,aF: 45
Plastic Unit Weight, pcf: 142.4
Samale Information
Date Cast: November 15, 2006 Time: 9:55am
Sampled by: Jose A. Martinez
Weather Conditions: Cloudy, light rain, windy
Accumulative Yards: 510
Placement Method: Pump
Sample Locations: See attached sketch for Location #6
Placement Location: Pavement W of Building
Specification
3-5
3-6
Test Method
ASTM C143
ASTM C231
ASTM C1064
ASTM C 1064
ASTM C 138
* =Field Test Results do not meet project specifications.
Laboratory Test Data Age at Maximum Compressive
Set Specimen Diameter Area Date Test Load Strength
No. ID (inches) (sq. inches) Tested (days) (Ibs) (psi)
6 1 6.00 28.27 11/22/2006 7 109,600 3,880
6 2 6.00 28.27 11/22/2006 7 108,700 3,840
Average (7 Days) 3,860
6 3 6.00 28.27 12/13/2006 28 131,820 4,660
6 4 6.00 28.27 12/13/2006 28 137,080 4,850
Average (28 Days) 4,760
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The-tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 6 of 7 Ot-ACSrR01-F~twe Kay
CONCRETE COMPRESSIVE STRENGTH TEST
rt N b ~ 94061163 0160
l~err~con
Repo um er.
6901 Carpenter Frwy, Ste #100
Service Date: November 15, 2006 Dallas, Texas 75247
(214) 630-1010
Client: Report Date: December 14, 2006
ProLogis Project: Freeport Corporate Ctr. Bldg. 6
Attn: Keith Porter Freeport Pkwy & Gateway
2310 LBJ Freeway Ste 200 Coppell, TX
Dallas TX 75234
Project No.: 94061163
Material Information
Specified Strength: 3500 psi ~ 28 Days
Batch Time: 10:30am Plant: 66
Supplier: Southern Star
Truck No: 3442 Ticket No: 1461999
Mix I.D. No.: 9339
Water Added Onsite Before Test: -Gallons
Water Added Onsite After Test: -Gallons
Field Test Data
Test Result
Slump, inches: 5.75
Air Content, %: 3.8
Concrete Temperature, aF: 61
Ambient Temperature,~F: 47
Plastic Unit Weight, pcf: 144.6
Sama/e Information
Date Cast: November 15, 2006 Time: 10:55am
Sampled by: Jose A. Martinez
Weather Conditions: Cloudy, raining, windy
Accumulative Yards: 610
Placement Method: Pump
Sample Locations: See attached sketch for Location #7
Placement Location: Pavement W of Building
Specification
3-5
3-6
Test Method
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
* =Field Test Results do not meet project specifications.
Laboratory Test Data Age at Maximum Compressive
Set Specimen Diameter Area Date Test Load Strength
No. ID (inches) (sq. inches) Tested days) (Ibs) (psi)
7 1 6.00 28.27 11 /22/2006 7 108,110 3, 820
7 2 6.00 28.27 11/22/2006 7 109,510 3,870
Average (7 Days) 3,850
7 3 6.00 28.27 12/13/2006 28 144,070 5,090
7 4 6.00 28.27 12/13/2006 28 134,870 4,770
Average (28 Days) 4,930
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Terracon Rep: Jose A. Martinez
Report Distribution
(1) ProLogis (1) Meinhardt 8 Assoc Architects PLLC ,(C/!/ ~ ~~~
(1) City of Coppell TX (1) Jordan Construction Services Reviewed by: 7/
(1) City of Coppell TX (1) Meinhardt 8 Assoc Architects PLLC RobeR D. Ray, S.
(1) Haynes Whaley Assoc Inc
Senior Project
The tests were pertormed in general accordance with applicable ASTM, AASHTO,_or DOT test methods. This report is exclusively for the u f the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are on y applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials-
Page 7 of 7 Ot-ACSR01-Fbtura Key
~arcr. ~l'eaJJJ~//o~-``7~to IAA TE l!-lS' ~a~
PROJECT N0.:~7OyIIf7~ • to/Ejd
~rr~con
Consulting Engineers & Scientists