Loading...
Town Center L1B2-LR 991223CONCRETE COMPRESSIVE STRENGTH TEST a division of Irenam 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/15/1999 Report No.: 9933512 Report Date 12/23/1999 Client No.: 26295000. Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 3 -5" AIR: 3 -6% TEST METHOD: ASTM C -143 (days) ASTM C -172 (psi) TYPE ASTM C -39 SAMPLE LOCATION: See below MIX I.D.: 41 PLACEMENT DATE: 12/15/1999 BATCH TIME: 10:48am TIME SAMPLED: 11:49am BY: Barry Cuble WEATHER CONDITIONS: Sunny cool, light winds TEMPERATURE (F) - AIR 50 F CONCRETE: 64 F TRUCK NO: 941 TICKET NO: 6113236 AIR CONTENT (%): 4.2 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Sidewalk: NW of building at retail area REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (tbs. force) (psi) TYPE 1 1 5.75 12/22/1999 7 96220 3400 1 2 5.75 12/22/1999 7 94980 3360 Average 3380 1 3 5.75 01 /12/2000 28 1 4 5.75 01/12/2000 28 Sample location: Between 5th and 6th columns east of west end of retail area. Technician: Barry Cuble Started: 10:00am Finished: 1:00pm Report Distribution: " JL^ - � E ing, Inc. (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson Inc. Paul D. Smith P.E. (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Senior Project Engineer (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1