Loading...
Town Center L1B2-LR 991208CONCRETE COMPRESSIVE STRENGTH TEST fDC ENGINEERM, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 1110911999 Report No.: 9930121 Report Date 12/08/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 CONCRETE CLASS: 163 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 5.50 ASTM C -172 28 ASTM C -39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.50 1 2 5.50 1 3 5.50 1 4 5.50 PLACEMENT DATE: 11/09/1999 BATCH TIME: 6:12am TIME SAMPLED: 7:25am BY: Joey Gordon WEATHER CONDITIONS: Clear, cool TEMPERATURE (F) - AIR 58 F CONCRETE: 66 F TRUCK NO: 780 TICKET NO: 6111046 AIR CONTENT ( % N/A UNIT WEIGHT (pef): N/A PLACEMENT LOCATION: Paving, northeast corner of building to northwest corner of building from against the wall to 20 feet from the building Sampled from truck. REPORT OF TESTS ACCUMULATIVE YARDS: 10 DATE AGE TESTED (days) Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 11/16/1999 7 134620 4760 11/16/1999 7 137950 4880 Average 4820 12/07/1999 28 143420 5070 12/07/1999 28 148610 5260 Sample location: Fourteen (14) from north wall Average 5170 feet west of far east corner and seven (7) feet FRACTURE TYPE This r �ri is c.vJnsively for the use of the client indicated ahove and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01111. Page I of 2 CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/09/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Report No.: 9930121 Report Date 12/08/1999 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 2 3 6.00 ASTM C -172 28 ASTM C -39 SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED CONCRETE CLASS: 163 PLACEMENT DATE: 11/09/1999 BATCH TIME: 7:26am TIME SAMPLED: 8:26am BY: Joey Gordon WEATHER CONDITIONS: Clear, cool TEMPERATURE (F) - AIR 64 F CONCRETE: 70 F TRUCK NO: 963 TICKET NO: 6111066 AIR CONTENT ( % N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page I REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 2 1 6.00 11/16/1999 7 139080 4920 2 2 6.00 11/16/1999 7 141630 5010 Average 4970 2 3 6.00 12/07/1999 28 155390 5500 2 4 6.00 12/07/1999 28 160570 5680 Average 5590 Sample location: Thirty seven (37) feet east of far west corner of building and six (6) feet from the wall Technician: Joey Gordon Started: 4:30am Finished: 10:30am �' engineering, Inc. Report Distribution: (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. y (1) S.0 Companies (1) Hill & Wilkinson Inc. Eugene Harbour (1) Tom Thumb Stores Division (1) City of Coppell - En.-r. Dept. Vice President (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc GILL Page 2 of 2