Loading...
Town Center L1B2-LR 991118CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/09/1999 Report No.: 9930121 Report Date 11/18/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 (days) ASTM C -172 (psi) ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 163 PLACEMENT DATE: 11/09/1999 BATCH TIME: 6:12am TIME SAMPLED: 7:25am BY: Joey Gordon WEATHER CONDITIONS: Clear, cool TEMPERATURE (F) -AIR 58 F CONCRETE: 66 F TRUCK NO: 780 TICKET NO: 6111046 AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving, northeast corner of building to northwest corner of building from against the wall to 20 feet from the building Sampled from truck. REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.50 11/16/1999 7 134620 4760 1 2 5.50 11/16/1999 7 137950 4880 Average 4820 1 3 5.50 12/07/1999 28 1 4 5.50 12/07/1999 28 Sample location: Fourteen (14) feet west of far east corner and seven (7) feet from north wall FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST fBC um m. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/09/1999 Report No.: 9930121 Report Date 11/18/1999 Client No.: 26295000 Project No.: 94991134 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 CONCRETE CLASS: 163 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below PLACEMENT DATE: 11/09/1999 BATCH TIME: 7:26am TIME SAMPLED: 8:26am BY: Joey Gordon WEATHER CONDITIONS: Clear, cool TEMPERATURE (F) - AIR 64 F CONCRETE: 70 F TRUCK NO: 963 TICKET NO: 6111066 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 2 1 6.00 2 2 6.00 2 3 6.00 2 4 6.00 MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/16/1999 11/16/1999 12/07/1999 12/07/1999 28 28 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4920 5010 4970 Sample location: Thirty seven (37) feet east of far west corner of building and six (6) feet from the wall Technician: Joey Gordon Started: 4:30am Finished: 10:30am FDC ring, Inc. Report Distribution: A yr (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas 7 139080 7 141630 Average 01LL Page 2 of 2