Loading...
Town Center L1B2-LR 991116CONCRETE COMPRESSIVE STRENGTH TEST fDC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/05/1999 Report No.: 9929853 R Date Report 11/16/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morns 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS 7 STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 12/03/1999 ASTM C-172 ASTM C -39 SAMPLE LOCATION: Ramp -5' E, center line CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED CONCRETE CLASS: 17 PLACEMENT DATE: 11/05/1999 BATCH TIME: 1 1:34am TIME SAMPLED: 12:15pm BY: Del Ratliff WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F) -AIR 79 F CONCRETE: 80 F TRUCK NO: 834 TICKET NO: 3094438 AIR CONTENT ( %): N/A UNIT WEIGHT (pef): N/A PLACEMENT LOCATION: Ramp -NW corner of Tom Thumb building, retail center westside slab -on -grade leaveout REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (Ibs. force) (psi) TYPE 1 1 5.50 11/12/1999 7 95420 3370 1 2 5.50 11/12/1999 7 94980 3360 Average 3370 1 3 5.50 12/03/1999 28 1 4 5.50 12/03/1999 28 Technician: Del Ratliff Started: 10:30am Finished: 1:00pm Engineering, Inc. Report Distribution: S( (I) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. Wilkinson, Inc. Eugene Harbour (1) S.0 Companies (1) Hill & (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of 1