Loading...
Town Center L1B2-LR 991103CONCRETE COMPRESSIVE STRENGTH TEST Ir ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/01/1999 Report No.: 9926540 Report Date 11/03/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: 3 -6% TEST METHOD: ASTM C -143 5600 ASTM C -172 10/29/1999 28 ASTM C -39 SAMPLE LOCATION: CYLINDER MARKED SET NO. See below CONCRETE CLASS: 163 PLACEMENT DATE: 10/01/1999 BATCH TIME: 9:49am TIME SAMPLED: 11:00am BY: Ervin Farris WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 77 F CONCRETE: 79 F TRUCK NO: 757 TICKET NO: 7077938 AIR CONTENT ( %): 4.1 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving REPORT OF TESTS MEASURED SLUMP DATE AGE (inches) TESTED (days) ACCUMULATIVE YARDS: 20 MAXIMUM COMPRESSIVE LOAD STRENGTH (Ibs. force) (psi) FRACTURE TYPE 1 1 5.00 10/08/1999 7 137220 4850 1 2 5.00 10/08/1999 7 130490 4610 Average 4730 1 3 5.00 10/29/1999 28 158250 5600 1 4 5.00 10/29/1999 28 162550 5750 Average 5680 Sample location: Center of curved area 10 yards northeast of northeast corner of building Technician: Ervin Farris Started: 9:30am Finished: 1:00pm Ineerlrig, Inc. Report Distribution: 7 i (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1