Loading...
Town Center L1B2-LR 991101CONCRETE COMPRESSIVE STRENGTH TEST fBC INGINEIRIZ , INC. 8901 Carpenter Frwy., Suite #100 Dallas, Teaas 75247 Date of Service: 09 /29/1999 Report No.: 9926323 Report Date 11/01/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: N/A AIR: N/A TEST METHOD: ASTM C -143 TESTED ASTM C -172 (lbs. force) ASTM C -39 SAMPLE LOCATION: 50' from loading dock CONCRETE CLASS: 22 PLACEMENT DATE: 09/29/1999 BATCH TIME: 6:03am TIME SAMPLED: 7:15am BY: Joey Gordon WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F) - AIR 62 F CONCRETE: 81 F TRUCK NO: 756 TICKET NO: 3092584 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): NIA PLACEMENT LOCATION: Paving in front of loading dock ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4360 4440 4400 6560 6480 6520 Technician: Joey Gordon Started: 5:00 Finished: 11:30am I-B Engineering, Inc. Report Distribution: f-�sG (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (l) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc O1LL Page 1 or 1 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 4.00 10/06/1999 7 123320 1 2 4.00 10/06/1999 7 125470 Average 1 3 4.00 10/27/1999 28 185540 1 4 4.00 10/27/1999 28 183180 Average Sampled from truck. ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4360 4440 4400 6560 6480 6520 Technician: Joey Gordon Started: 5:00 Finished: 11:30am I-B Engineering, Inc. Report Distribution: f-�sG (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (l) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc O1LL Page 1 or 1 CONCRETE COMPRESSIVE STRENGTH TEST fDC INGINEERIlVG, INC. 8901 Carpenter Frwy., Suite #100 Dalian, Tesas 75247 Date of Service: 09 /29/1999 Report No.: 9926334 Report Date 11/01/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 SET NO. ASTM C -172 TESTED (days) ASTM C -39 SAMPLE LOCATION: 30' from south entrance CONCRETE CLASS: 163 PLACEMENT DATE: 09/29/1999 BATCH TIME: 7:23am TIME SAMPLED: 8:37am BY: Joey Gordon WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 66 F CONCRETE: 86 F TRUCK NO: 602 TICKET NO: 7077761 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): NIA PLACEMENT LOCATION: Fire lane next to the dock This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 2 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM - COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.50 10/06/1999 7 110890 3920 1 2 6.50 10/06/1999 7 106250 3760 Average 3840 1 3 6.50 10/27/1999 28 138790 4910 1 4 6.50 10/27/1999 28 147700 5220 Average 5070 Technician Time: See Report #9926323 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Teaas 75247 Date of Service: 09/29/1999 Report No.: 9926334 Report Date 11/01/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C -143 2 3 ASTM C -172 10/27/1999 ASTM C -39 SAMPLE LOCATION: 25' from north corner CONCRETE CLASS: 163 PLACEMENT DATE: 09/29/1999 BATCH TIME: 8:15am TIME SAMPLED: 10:15am BY: Joey Gordon WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 82 F CONCRETE: 90 F TRUCK NO: 753 TICKET NO: 6108087 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED 3870 MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 4.50 10/06/1999 2 2 4.50 10/06/1999 2 3 4.50 10/27/1999 2 4 4.50 10/27/1999 Sampled from truck. MAXIMUM AGE LOAD (days) (lbs. force) ACCUMULATIVE YARDS: 10 .COMPRESSIVE STRENGTH (psi) FRACTURE TYPE 7 109380 3870 7 110250 3900 Average 3890 28 140770 4980 28 142760 5050 Average 5020 Technician: Joey Gordon Started: Finished: Engineering, Inc. Report Distribution: (1) Ewing Properties, Inc. (l) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (l) Hill & Wilkinson, Inc. Eugene Harbour (])Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (t) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST ENG111EER , INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/29/1999 Report No.: 9926335 Report Date 11/01/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Ma AIR: N/A TEST METHOD: ASTM C -143 7 ASTM C -172 6.00 ASTM C -39 SAMPLE LOCATION: Column Diamonds C /3.6 CONCRETE CLASS: 17 PLACEMENT DATE: 09/29/1999 BATCH TIME: 9:00am TIME SAMPLED: 9:50am BY: Joey Gordon WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 819 AIR CONTENT ( %a): N/A PLACEMENT LOCATION: Column Diamonds C/2 -7 REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 1 1 6.00 10/06/1999 7 1 2 6.00 10/06/1999 7 1 3 6.00 10/27/1999 28 1 4 6.00 10/27/1999 28 Technician Time: See Report #9926323 Sample taken from truck. Technician Joey Gordon Started: Finished: Report Distribution: (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. (1) Michael F. Twichell, Inc. Clear 80 F CONCRETE: 87 F TICKET NO: 3092596 UNIT WEIGHT (pcf): N/A MAXIMUM LOAD (lbs. force) 97830 99270 Average 133540 139930 Average ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi FRACTURE TYPE 3460 3510 3490 4720 4950 4840 fBC Engineering, Inc. �G Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Project No.: 94991134 O1LL Page 1 of I