Loading...
Town Center L1B2-LR 991012CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, T exas 75247 Date of Service: 10/01/1999 Report No.: 9926540 Report Date 10/12/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Dill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: 3 -6% TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) CONCRETE CLASS: 163 PLACEMENT DATE: 10/01/1999 BATCH TIME: 9:49am TIME SAMPLED: 11:00am BY: Ervin Farris WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 77 F CONCRETE: 79 F TRUCK NO: 757 TICKET NO: 7077938 AIR CONTENT (%): 4.1 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 1 1 5.00 10/08/1999 1 2 5.00 10/08/1999 1 3 5.00 10/29/1999 1 4 5.00 10/29/1999 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas ACCUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 7 137220 4850 7 130490 4610 Average 4730 28 28 Sample location: Center of curved area 10 yards northeast of northeast corner of building Technician: Ervin Farris Started: 9:30am Finished: 1:00pm I-T4" Engi c. Report Distribution: ,1 0" (l) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1