Loading...
Town Center L1B2-LR 990929REPORT OF REINFORCING STEEL INSPECTION fBc 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/29/99 Client No.: 26295000 Report No.: 9926322 Project No.: 94991134 Client: Ewing Properties, Inc. Project: Tom Thumb 14990 Landmark Blvd, Suite 300 Denton Tap & Sandy Lake Dallas, Texas 75240 -6729 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: S7, Civil #3 Locations /Items Inspected: Paving, northeast loading dock and east fire lane; started at northeast corner of building including turn radius to the south edge of the Tom Thumb building Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tied Properly Bar size X Proper Bar Placement X Ties and Spaces Bar Grade X Properly Tied X Stirrup Spacing/Type Reber Clean X Dowel Bars in Place X Welded Splices Form Clean X Proper Bar Supports X Mechanical Splices N umber of Bans X Lapped Splices X Proper Cover X Discrepancies /Comments: Technician: J. Gordan Report Distribution: (1) Ewing Properties, Inc. (1) S. C. Companies (1) Tom Thumb Stores Division (1) Michael F. Twichell, Inc. No discrepancies noted at the time of inspection. started: See Report #9926323 (1) Raymond L. Goodson, Jr. Engrs. (1) Hill & Wilkinson, Inc. (1) City of Coppell - Engr. Dept. FDC En ineering, Inc. Paul D. Smith, P.E. Senior Project Engineer 309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.