Loading...
Town Center L1B2-LR 990825CONCRETE COMPRESSIVE STRENGTH TEST fBC ElvcJI ZF.EEM, U4C. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Report No.: 9920298 Report Date 08/25/1999 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0° Max AIR: NA TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 5:45am TIME SAMPLED: 6:30am BY: Harvey Plunk WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 85 F CONCRETE: 90 F TRUCK NO: 756 TICKET NO: 3088647 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving in driveway SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) FRACTURE TYPE 1 1 4.50 08/03/1999 7 90480 3200 1 2 4.50 08/03/1999 7 90800 3210 Average 3210 1 3 4.50 08/24/1999 28 120990 4280 1 4 4.50 08/24/1999 28 117330 4150 Average 4220 Sample location: Northeast drive on lot, 100 from far west end This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST f 19C IN - l" I E ! ' W. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Report No.: 9920298 Report Date 08/25/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 PROJECT DATA MAXIMUM AGE LOAD (days) (lbs.force) CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: NA TEST METHOD: ASTM C -143 ASTM C -172 4320 ASTM C -39 SAMPLE LOCATION: CYLINDER MARKED SET 2 2 2 2 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. NO. See below MEASURED SLUMP DATE (inches) TESTED 1 5.50 08/03/1999 2 5.50 08/03/1999 3 5.50 08/24/1999 4 5.50 08/24/1999 Sample location: Northeast drive on lot, 120' Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 7 90840 3210 7 88050 3110 Average 3160 28 123750 4380 28 120340 4260 Average 4320 from far west end This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 964 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCHTIME: 6:51am TIME SAMPLED: 7:35am BY: Harvey Plunk Sunny 87 F CONCRETE: 90 F TICKET NO: 3088662 UNIT WEIGHT (pcf): N/A REPORT OF TESTS GILL Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST IF19C ENGIIVEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Report No.: 9920298 Report Date 08/25/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: NA TEST METHOD: ASTM C -143 3 3 ASTM C -172 08/24/1999 ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 8:55am TIME SAMPLED: 9:45 am BY: Harvey Plunk WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 830 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.00 08/0311999 3 2 5.00 08/03/1999 3 3 5.00 08/24/1999 3 4 5.00 08/24/1999 AGE (days) 7 78400 7 83580 Average 111680 115000 Average from far west end 28 28 Sample location: Far northeast drive on lot, 175' Sunny 88 F CONCRETE: 90 F TICKET NO: 3088679 UNIT WEIGHT (pcf): N/A ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE LOAD STRENGTH (Ibs. force) (psi) 2770 2960 2870 3950 4070 4010 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH `BEST fBC ENGINEERIIdG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Report No.: 9920298 Report Date 08/25/1999 Client No.: 26295000 Project No.: 94991134 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: NA TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 9:30am TIME SAMPLED: 11:OOam BY: Harvey Plunk WEATHER CONDITIONS: Sunny, hot TEMPERATURE (F) - AIR 90 F CONCRETE: 91 F TRUCK NO: 944 TICKET NO: 6103096 AIR CONTENT (%): N/A UNIT WEIGHT (pef): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) DATE AGE TESTED (days) FRACTURE TYPE MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 4 1 6.00 08/03/1999 7 87410 3090 4 2 6.00 08/03/1999 7 84430 2990 Average 3040 4 3 6.00 08/24/1999 28 106330 3760 4 4 6.00 08/24/1999 28 107370 3800 Average 3780 Sample location: South driveway, 30' east of job trailer Technician: Harvey Plunk Report Distribution: (1) Ewing Properties, Inc. (1) S.0 Companies (1) Tom Thumb Stores Division (1) Michael F. Twichell, Inc. Started: 5:00am Finished: 1:00pm Engineering, Inc. (1) Raymond L. Goodson, Jr. Engrs. 6 ! (1) Hill & Wilkinson, Inc. Eugene Harbour (1) City of Coppell - Engr. Dept. Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 4 of 4