Town Center L1B2-LR 990810CONCRETE COMPRESSIVE STRENGTH TEST fDC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/08/1999 Report No.: 9918541 Report Date
08/10/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP:
5.0" Max
AIR:
3 -5%
TEST METHOD:
ASTM C -143
(days)
ASTM C -172
(psi)
ASTM C -39
SAMPLE LOCATION: See below
CONCRETE CLASS: 163
PLACEMENT DATE: 07/08/1999 BATCH TIME: 2:43am
TIME SAMPLED: 3:30am BY: Greg Dimock
WEATHER CONDITIONS: Clear
TEMPERATURE (F) = AIR 76 F CONCRETE: 90 F
TRUCK NO: 746 TICKET NO: 3087369
AIR CONTENT (%): N/A UNIT WEIGHT (pef): N/A
PLACEMENT LOCATION:
Paving- Parking area, 100' x 120' west of building, Fire lane- East fire lane in front on side
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER
MEASURED
MAXIMUM
COMPRESSIVE
MARKED
SLUMP
DATE
AGE
LOAD
STRENGTH
SET NO.
(inches)
TESTED
(days)
(lbs. force)
(psi)
1 1
4.50
07/15/1999
7
117540
4160
1 2
4.50
07/15/1999
7
120320
4250
Average
4210
1 3
4.50
08/05/1999
28
142970
5060
1 4
4.50
08/05/1999
28
146150
5170
Average
5120
Sample location: 20' West
of east joint
and 20'
north of south
joint
Sampled from
truck.
FRACTURE
TYPE
N'
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST fir
ENGMERM, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/08/1999 Report No.: 9918541 Report Date
08/10/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP:
5.0" Max
AIR:
3 -5%
TEST METHOD:
ASTM C -143
(days)
ASTM C -172
(psi)
ASTM C -39
SAMPLE LOCATION: See below
CONCRETE CLASS: 163
PLACEMENT DATE: 07/08/1999 BATCH TIME: 4:12am
TIME SAMPLED: 4:55am BY: Greg Dimock
WEATHER CONDITIONS:
TEMPERATURE (F) = AIR
TRUCK NO: 734
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
Clear
75 F CONCRETE: 90 F
TICKET NO: 3087383
UNIT WEIGHT (pcf): N/A
ACCUMULATIVE YARDS: 10
CYLINDER
MEASURED
MAXIMUM
COMPRESSIVE
MARKED
SLUMP
DATE
AGE
LOAD
STRENGTH
SET NO.
(inches)
TESTED
(days)
(lbs. force)
(psi)
2 1
4.00
07/15/1999
7
129990
4600
2 2
4.00
07/15/1999
7
121320
4290
Average
4450
2 3
4.00
08/05/1999
28
170560
6030
2 4
4.00
08/05/1999
28
174420
6170
Average
6100
Sample location: Five (5)
feet south
of north joint
and 20' east
of west joint
Sampled from
truck.
FRACTURE
TYPE
y
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
O1LL Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST fBC
EN - 11 IEEF IN , INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/08/1999 Report No.: 9918541 Report Date
08/10/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
DATE
TESTED
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP:
5.0" Max
AIR:
3 -5%
TEST METHOD:
ASTM C -143
4450
ASTM C -172
28
ASTM C -39
SAMPLE LOCATION:
See below
REPORT OF TESTS
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
3 1
5.00
3 2
5.00
3 3
5.00
3 4
5.00
CONCRETE CLASS: 163
PLACEMENT DATE: 07/08/1999 BATCH TIME: 5:16am
TIME SAMPLED: 6:40am BY: Greg Dimock
WEATHER CONDITIONS:
TEMPERATURE (F) = AIR
TRUCK NO: 968
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
AGE
(days)
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Clear
74 F CONCRETE: 91 F
TICKET NO: 3087394
UNIT WEIGHT (pcf): N/A
ACCUMULATIVE YARDS: 10
MAXIMUM COMPRESSIVE
LOAD STRENGTH
(lbs. force) (psi)
07/15/1999
7
98620
3490
07/15/1999
7
97110
3430
Average
3460
08/05/1999
28
125740
4450
08/05/1999
28
119580
4230
Sample location: Thirty (30)
in fire lane
Sampled from truck.
Average 4340
feet north of south joint and 10' west of east curb
FRACTURE
TYPE
HIM
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Project No.: 94991134
OtLL Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST f 19C
1TI Al IEFF , INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/08/1999 Report No.: 9918541 Report Date
08/10/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Mill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP:
5.0" Max
AIR:
3 -5%
TEST METHOD:
ASTM 0-143
MARKED
ASTM C -172
DATE AGE
ASTM C -39
CONCRETE CLASS: 163
PLACEMENT DATE: 07/08/1999 BATCHTIME: 7:21am
TIME SAMPLED: 8:20am BY Greg Dimock
WEATHER CONDITIONS: Clear
TEMPERATURE (F) --AIR 80 F CONCRETE: 92 F
TRUCK NO: 615 TICKET NO: 7073764
AIR CONTENT ( % ): N/A UNIT WEIGHT (pcf): N/A
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION:
See below
REPORT OF TESTS
ACCUMULATIVE YARDS: 10
CYLINDER
MEASURED
MAXIMUM
COMPRESSIVE
MARKED
SLUMP
DATE AGE
LOAD
STRENGTH FRACTURE
SET NO.
(inches)
TESTED (days)
(lbs. force)
(psi) TYPE
4 1
6.50
07/15/1999 7
113690
4020
4 2
6.50
07/15/1999 7
109630
3880
Average
3950
4 3
6.50
08/05/1999 28
147630
5220
4 4
6.50
08/05/1999 28
146150
5170
Average
5200
Sample location:
Forty
(40) feet east of west form and
10' south
of north curb in
fire lane
Sampled from
truck.
Technician: Greg Dimock
Started: 2:00am Finished: 2:30pm
� Engine C.
Report Distribution:
(1) Ewing Properties, Inc.
(1) Raymond L. Goodson, Jr. Engrs.
(I) S.0 Companies
(1) Hill & Wilkinson, Inc.
Eugene arbour
(1) Tom Thumb Stores Division
(1) City of Coppell - Engr. Dept.
Vice President
(1) Michael F. Twichell, Inc
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc
O1LL Page 4 of 4
CONCRETE COMPRESSIVE STRENGTH TEST fBC
EN ' ll IEER , NC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/08/1999 Report No.: 9918593 Report Date
08/10/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
CONCRETE CLASS: 38
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
7
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP:
5.0" Max
AIR:
N/A
TEST METHOD:
ASTM C -143
78820
ASTM C -172
08/05/1999
ASTM C -39
SAMPLE LOCATION: See below
PLACEMENT DATE: 07/08/1999 BATCH TIME: 8:58am
TIME SAMPLED: 10:30am BY: Greg Dimock
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 89 F CONCRETE: 92 F
TRUCK NO: 786 TICKET NO: 7073776
AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
PLACEMENT LOCATION:
Wall- east retaining wall
REPORT OF TESTS
CYLINDER
MARKED
SET NO.
1 1
1 2
1 3
1 4
MEASURED
SLUMP DATE
(inches) TESTED
Sample location:
Technician Time:
AGE
(days)
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
ACCUMULATIVE YARDS: 10
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lbs. force) (psi) TYPE
7.50
07/15/1999
7
66380
7.50
07/15/1999
7
67390
Average
7.50
08/05/1999
28
78820
7.50
08/05/1999
28
84810
Average
Five
feet north of south
end- first
lift
See
Report #9918541
2350
2380
2370
2790
3000
2900
Technician: Greg Dimock Started: Finished: En in c.
g
Report Distribution:
(1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs.
(1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour
(1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President
(1) Michael F. Twichell, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
O1LL Page 1 of 1
REPORT OF REINFORCING STEEL INSPECTION
fBC
ENGRIFFRM,11C.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/10/99
Client No.: 26295000
Project No.: 94991134
Client: Ewing Properties, Inc. Project: Tom Thumb
14990 Landmark Blvd, #300 Denton Tap & Sandy Lake
Dallas TX 75240 -6729 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Contractor's
LocationsiItems Inspected: Sidewalk on the east side of Denton Tap Rd. between north and south approaches
and truck loading dock
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED
CORRECT
INCORRECT
ITEMS INSPECTED
CORRECT
INCORRECT
ITEMS INSPECTED
CORRECT
INCORRECT
Placing Drawings Approved
X
Bar Length and Shape
X
Column Tied Properly
Bar Size
X
Proper Bar Placement
X
Ties and Spaces
Bar Grade
X
Properly Tied
X
I
Stirrup Spacing/Type
Reber Clean
X
Dowel Bars in Place
X
Welded Splices
Form Clean
X
Proper Bar Supports
X
Mechanical Splices
Number of Bars
X
Lapped Splices
X
Proper Cover
Discrepancies /Comments:
Technician: D. Ratliff
Report Distribution:
(1) Ewing Properties, Inc.
(1) S.C. Companies
(1) Tom Thumb Stores Division
(1) Michael F. Twichell, Inc.
No discrepancies were noted at the time of inspection.
Started: 5:00 a.m.
(1) Raymond L. Goodson, Jr. Engrs.
(1) Hill & Wilkinson, Inc.
(1) City of Coppell -Engr. Dept.
Report No.: 9921631
Stopped: 6:00 a.m.
Engineering, Inc.
Paul D. Smith, P.E.
Senior Project Engineer
309dp This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.