Loading...
Town Center L1B2-LR 990806CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Report No.: 9920298 Report Date 08/06/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Bill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: NA TEST METHOD: ASTM C -143 SET NO. ASTM C -172 TESTED (days) ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 5:45am TIME SAMPLED: 6:30am BY: Harvey Plunk WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 756 AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving in driveway Sunny 85 F CONCRETE: 90 F TICKET NO: 3088647 UNIT WEIGHT (pcf): N/A Sample location: Northeast drive on lot, 100' from far west end IN This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 4 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.50 08/03/1999 7 90480 3200 1 2 4.50 08/03/1999 7 90800 3210 Average 3210 1 3 4.50 08/24/1999 28 1 4 4.50 08/24/1999 28 Sample location: Northeast drive on lot, 100' from far west end IN This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST fDC ENGINEERIN(', INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Report No.: 9920298 Report Date 08/06/1999 Client No.: 26295000 Project No.: 94991134 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: NA TEST METHOD: ASTM C -143 (inches) ASTM C -172 (days) ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 6:51am TIME SAMPLED: 7:35am BY: Harvey Plunk WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 87 F CONCRETE: 90 F TRUCK NO: 964 TICKET NO: 3088662 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 Sample location: Northeast drive on lot, 120' from far west end ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3210 3110 3160 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 2 of 4 REPORT OF TESTS CYLMER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs force) 2 1 5.50 08/03/1999 7 90840 2 2 5.50 08/03/1999 7 88050 Average 2 3 5.50 08/24/1999 28 2 4 5.50 08/24/1999 28 Sample location: Northeast drive on lot, 120' from far west end ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3210 3110 3160 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 2 of 4 CRETE COMPRESSIVE STRENGTH TEST fBC ENGIlHEEMU, INC. 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date lof Service: 07/27/1999 No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 PROJECT DATA TEST SET 3 3 3 3 CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 8:55am TIME SAMPLED: 9:45am BY: Harvey Plunk. WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 88 F CONCRETE: 90 F TRUCK NO: 830 TICKET NO: 3088679 AIR CONTENT (40): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. rOR: Hill & Wilkinson i SUPPLIER: Lattimore 3 TION REQUIREMENTS iGTH: 3000 psi @ 28 Days P: 5.0" Max NA IOD: ASTM C -143 ASTM C -172 ASTM C -39 LOCATION: See below )ER MEASURED ;ED SLUMP NO. (inches) 1 5.00 2 5.00 3 5.00 4 5.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) Report No.: 9920298 Report Date 08/06/1999 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas 08/03/1999 7 78400 08/03/1999 7 83580 Average 08/24/1999 28 08/24/1999 28 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2770 2960 2870 le location: Far northeast drive on lot, 175' from far west end report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL I Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/1999 Report No.: 9920298 Report Date 08/06/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0° Max AIR: NA TEST METHOD: ASTM C -143 28 ASTM C -172 6.00 ASTM C -39 SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED CONCRETE CLASS: 41 PLACEMENT DATE: 07/27/1999 BATCH TIME: 9:30am TIME SAMPLED: 11:00am BY: Harvey Plunk WEATHER CONDITIONS: Sunny, hot TEMPERATURE (F) - AIR 90 F CONCRETE: 91 F TRUCK NO: 944 TICKET NO: 6103096 AIR CONTENT (%): N/A UNIT wEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS MAXIMUM AGE LOAD (days) (Ibs.force) ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4 1 6.00 08/03/1999 7 87410 3090 4 2 6.00 08/03/1999 7 84430 2990 Average 3040 4 3 6.00 08/24/1999 28 4 4 6.00 08/24/1999 28 Sample location: South driveway, 30' east of job trailer Technician: Harvey Plunk Started: 5:00am Finished: 1:00pm T44" Report Distribution: Engineering (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & WiWnson, Inc. Eugene Har r (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 4 of 4