Loading...
Town Center L1B2-LR 990720CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGIIVEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06 /18/1999 Report No.: 9916748 Report Date 07/20/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Moms 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3 -5" AIR: N/A TEST METHOD: ASTM C -143 (days) ASTM C -172 (psi) ASTM C -39 SAMPLE LOCATION: See placement location CONCRETE CLASS: 163 PLACEMENT DATE: 06/18/1999 BATCH TIME: 4:10am TIME SAMPLED: 4:50am BY: Jimmy Atnip WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 69 F CONCRETE: 78 F TRUCK NO: 785 AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving- west side of Tom Thumb (See attached sketch) REPORT OF TESTS TICKET NO: 7072757 UNIT WEIGHT (pcf): N/A ACCUMULATIVE YARDS: 80 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.50 06/25/1999 7 128420 4540 1 2 5.50 06/25/1999 7 130890 4630 Average 4590 1 3 5.50 07/16/1999 28 132200 4680 1 4 5.50 07/16/1999 28 127720 4520 Average 4600 Placement made with pump, sample taken from mixer. FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST FBC ENCIlVFFRM, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Teas 75247 Date of Service: 06 /18/1999 Report No.: 9916748 Report Date 07/20/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3 -5" AIR: N/A TEST METHOD: ASTM C -143 (days) ASTM C -172 (psi) ASTM C -39 SAMPLE LOCATION: See page 1 CONCRETE CLASS: 163 PLACEMENT DATE: 06 /18/1999 BATCH TIME: 5:17am TMIE SAMPLED: 5:45am BY: Jimmy Atnip WEATHER CONDITIONS: Overcast TEMPERATURE (F) - AIR 65 F CONCRETE: 79 F TRUCK NO: 616 TICKET NO: 7072768 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS ACCUMULATIVE YARDS: 190 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.25 06/25/1999 7 111210 3930 2 2 5.25 06/25/1999 7 113080 4000 Average 3970 2 3 5.25 07/16/1999 28 159480 5640 2 4 5.25 07/16/1999 28 150650 5330 Average 5490 Placement made with pump, sample taken from mixer. FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01 LL Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST fBC E K E I ;UM, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06 /18/1999 Report No.: 9916748 Report Date 07/20/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3 - 5 " AIR. N/A TEST METHOD: ASTM C -143 3 3 ASTM C -172 07/16/1999 ASTM C -39 SAMPLE LOCATION: See page 1 CONCRETE CLASS: 163 PLACEMENT DATE: 06/18/1999 BATCH TIME: 6:08am TIME SAMPLED: 6:36am BY: Jimmy Atnip WEATHER CONDITIONS: Overcast TEMPERATURE (F) - Am 65 F CONCRETE: 78 F TRUCK NO: 757 TICKET NO: 7072775 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): NIA PLACEMENT LOCATION: See page 1 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas REPORT OF TESTS ACCUMULATIVE YARDS: 260 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.50 06/25/1999 3 2 5.50 06/25/1999 3 3 5.50 07/16/1999 3 4 5.50 07/16/1999 AGE (da 7 7 28 28 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (ibs. force) (psi) TYPE 107450 110750 Average 126930 129570 Average Placement made with pump, sample taken from mixer. 3800 3920 3860 4490 4580 4540 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01 LL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST fBC 8901 Carpenter Frwy., Suite #100 Dallas, Tem 75247 Date of Service: 06 11811999 Report No.: 9916748 Report Date 07/20/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3 -5" AIR: N/A TESTMETHOD: ASTM C -143 (psi) TYPE ASTM C -172 06/25/1999 7 ASTM C -39 SAMPLE LOCATION: See page 1 CONCRETE CLASS: 163 PLACEMENT DATE: 06/18/1999 BATCH TIME: 8:30am TIME SAMPLED: 9:00am BY: Jimmy Atnip WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 75 F CONCRETE: 79 F TRUCK NO: 611 TICKET NO: 7072791 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 (t) Michael F. Twichell, Inc This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4 REPORT OF TESTS ACCUMULATIVE YARDS: 350 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 6.00 06/25/1999 7 91710 3240 4 2 6.00 06/25/1999 7 93850 3320 Average 3280 4 3 6.00 07/16/1999 28 130730 4620 4 4 6.00 07/16/1999 28 128970 4560 Average 4590 Placement made with pump, sample taken from mixer. Technician: Jimmy Atnip Started: 4:00am Finished: 7:00am 1 Inc. Report Distribution: e f ngineering, 7 Z ,' (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (t) Michael F. Twichell, Inc This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4 . C -- � - / 1 , • ••s •- 1 �) `;,, � to X411 1 - 4'. tn - x.00 f- � tal I i' / c ; 0 4 170 �o � ,\ •\ � \ \ \ •'\ •� \ � w It ? DO 'Q \ \, \ 4 ~— ±-- -+ ---+,, - t- -4. -, • ;— a 1 ► .s. ....r.., . \.` �\ �. 1 :\ \ [••. ” l..- .. - 111 � � \ r 30•X 30• ACCESS ESM'T. OIL , 1 irF .-- - - - - -- -142 Q' I l e „ r • ------ - - - �!- ~ NI -- ------ ---- - - - -�- U 1 1 W a I I a: O 1 ,n I 3 W 1 J I I - J - I 1 _ — 1= I . C -- � - / 1 , • ••s •- 1 �) `;,, � to X411 1 - 4'. tn - x.00 f- � tal I i' / c ; 0 4 170 �o � ,\ •\ � \ \ \ •'\ •� \ � w It ? DO 'Q \ \, \ 4 ~— ±-- -+ ---+,, - t- -4. -, • ;— a 1 ► .s. ....r.., . \.` �\ �. 1 :\ \ [••. ” l..- .. - 111 � � CONCRETE COMPRESSIVE STRENGTH TEST j� T 7 MERING, M. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/08/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Report No.: 9918541 Report Date 07/20/1999 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR 3 -5% TEST METHOD ASTM C -143 (inches) ASTM C -172 (days) ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 163 PLACEMENT DATE: 07/08/1999 BATCH TIME 2:43am TIME SAMPLED: 3:30am BY: Greg Dimock WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 76 F CONCRETE: 90 F TRUCK NO: 746 TICKET NO: 3087369 AIR CONTENT (%): N /A UNIT WEIGHT (pcf): N /A PLACEMENT LOCATION: Paving- Parking area, 100' x 120' west of building, Fire lane- East fire lane in front on side ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4160 4250 4210 Sample location: 20' West of east joint and 20' north of south joint Sampled from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 4 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 4.50 07/15/1999 7 117540 1 2 4.50 07/15/1999 7 120320 Average 1 3 4.50 08/05/1999 28 1 4 4.50 08/05/1999 28 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4160 4250 4210 Sample location: 20' West of east joint and 20' north of south joint Sampled from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST f 19C ENGIIVEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/08/1999 Report No.: 9918541 Report Date 07/20/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 30W psi @ 28 Days SLUMP: 5.0" Max AIR: 3 -5% TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: CYLINDER MARKED SET M See below CONCRETE CLASS: 163 PLACEMENT DATE: 07/08/1999 BATCH TIME: 4:12am TIME SAMPLED: 4:55am BY: Greg Dimock WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 75 F CONCRETE: 90 F TRUCK NO: 734 TICKET NO: 3087383 AIR CONTENT (%): NIA UNIT WEIGHT (pcf): NIA PLACEMENT LOCATION: See page 1 REPORT OF TESTS ACCUMULATIVE YARDS: 10 MEASURED SLUMP DATE AGE (inches) TESTED (days) MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 1 4.00 07/15/1999 7 129990 4600 2 4.00 07/15/1999 7 121320 4290 Average 4450 3 4.00 08/05/1999 28 4 4.00 08/05/1999 28 Sample location: Five (5) feet south of north joint and 20' east of west joint Sampled from truck. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST fDC EIVGIlVEERINC, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/08/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Report No.: 9918541 Report Date 07/20/1999 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: 3 -5% TEST METHOD: ASTM C -143 7 ASTM C -172 5.00 ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 163 PLACEMENT DATE: 07/08/1999 BATCH TIME: 5:16arn TIME SAMPLED: 6:40am BY: Greg Dimock WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 74 F CONCRETE: 91 F TRUCK NO: 968 TICKET NO: 3087394 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 3 1 5.00 07/15/1999 7 3 2 5.00 07/15/1999 7 3 3 5.00 08/05/1999 28 3 4 5.00 08/05/1999 28 Sample location: Thirty (30) feet north of south joint and 10' west of east curb in fire lane Sampled from truck. dv This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 3 of 4 ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 98620 3490 97110 3430 Average 3460 Sample location: Thirty (30) feet north of south joint and 10' west of east curb in fire lane Sampled from truck. dv This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST fBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/08/1999 Report No.: 9918541 Report Date 07/20/1999 Client No.: 26295000 Client: Ewing Properties, Inc. Attn: Mark Morris 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Project No.: 94991134 Project: Tom Thumb Denton Tap & Sandy Lake Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hill & Wilkinson CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: 3 -5% TEST METHOD: ASTM C -143 7 ASTM C -172 6.50 ASTM C -39 SAMPLE LOCATION: See below CONCRETE CLASS: 163 PLACEMENT DATE: 07/08/1999 BATCH TIME: 7:21 am TIME SAMPLED: 8:20am BY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 615 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED LOAD STRENGTH FRACTURE MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 4 1 6.50 07/15/1999 7 4 2 6.50 07/15/1999 7 4 3 6.50 08/05/1999 28 4 4 6.50 08/05/1999 28 Clear 80 F CONCRETE: 92 F TICKET NO: 7073764 UNIT WEIGHT (pcf): N/A ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 113690 4020 109630 3880 Average 3950 Sample location: Forty (40) feet east of west form and 10' south of north curb in fire lane Sampled from truck. Technician: Greg Dimock Started: 2:00am Finished: 2:30pm 17JL. En gin C. Report Distribution: (1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. (1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour (1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President (1) Michael F. Twichell, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4 IN-PLACE DENSITY TESTING XI RM, Dr- 8901 Carpenter Fruy., Suite #100 Dallas, Te=as 75247 Date of Service: 07/02/1999 Report No.: 9918153 Report Date Client No.: 26295000 Project No.: 94991134 07/20/1999 Client: Ewing Properties, Inc. Project: Tom Thumb Attn: Mark Morris Denton Tap & Sandy Lake 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Coppell, Texas Services: In -place density testing. (1) Michael F. Twichell, Inc This repot is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1 PROJECT DATA CONTRACTOR: Hill & Wilkinson Laboratory Test Method: ASTM D -698 Field Test Method: ASTM 13-2922 ASTM D -3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M /D No. Description Moisture % Density pcf Moisture Density 1 Lt. bm/med bm clayey sand 15.0 119.0 -202% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (• /.) (pd) (•/. mu) Sanitary Sewer 99 Grid line D.3/4.5, Final lift 1 13.5 116.3 98 100 Grid line C.8/4, Final lift 1 14.6 115.8 97 101 Grid line B.5/3.3, Final lift 1 14.8 117.7 99 102 Grid line B.5/2.8, Final lift 1 13.8 115.2 97 Test results on this report meet project specification. * Tecbnidan: Roy Montgomery g Bring, Inc. Report Distribution: (1) Bwiug Properties, Inc. (1) Raymmd L. Goodson, Jr. Fags. (1) S.0 Companies (1) Ilia & Wilkatson, Inc. Paul D. Smith, P.E. (1) Tam Thumb Stores Division (1) City of Coppell -Eap{. Dept. Senior Project Engineer (1) Michael F. Twichell, Inc This repot is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1