Town Center L1B2-LR 990713CONCRETE COMPRESSIVE STRENGTH TEST fBC
ENGINEERING, M.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9916135 Report Date
Date of Service: 06/11/1999 p 07/13/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap &: Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore Materials
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
4000 psi @ 28 Days
SLUMP:
3 -5 11
AIR:
N/A
TEST METHOD:
ASTM C-143
ASTM C -172
ASTM C -39
SAMPLE LOCATION: See placement location
CYLINDER MEASURED
MARKED SLUMP DATE AGE
SET NO. (incites) TESTED (days)
1 1 3.50 06/14/1999 3
MAXIMUM
LOAD
(lbs. force)
95710
ACCUMULATIVE YARDS: 9.5
COMPRESSIVE
STRENGTH FRACTURE
( TYPE
3380
1 2 3.50 06/18/1999 7 113890
4030
1 3 3.50 07/09/1999 28 120110
4250
1 4 3.50 07/09/1999 28 121660
4300
Average
4280
Technician: Roy Montgomery Started: 12:00pm Finished: 2:00pm eying, Inc.
Report Distribution:
(1) Ewing Properties, Inc. (1) Raymond L. Goodson, Jr. Engrs. —
(1) S.0 Companies (1) Hill & Wilkinson, Inc. Eugene Harbour
(1) Tom Thumb Stores Division (1) City of Coppell - Engr. Dept. Vice President
(1) Michael F. Twichell, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc
CONCRETE CLASS: 42
PLACEMENT DATE: 06/11/1999 BATCH TIME: 12:45pm
TIME SAMPLED: 1:15pm BY: Roy Montgomery
WEATHER CONDITIONS: Clear
TEMPERATURE (F) -AIR 90 F CONCRETE: 84 F
TRUCK NO: 820 TICKET NO: 3085648
AIR CONTENT ( %): N/A UNIT WEIGHT (pct): NIA
PLACEMENT LOCATION:
Replacement paving at northbound Denton -Tap Road storm drain Line C, Station 0 +20
REPORT OF TESTS
O1LL Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST fBC
> M, ».
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 06 /09/1999 Report No.: 9915823 Report Date
07/13/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUM:
3 -5"
AIR:
3 -6 %
TEST METHOD:
ASTM C -143
(inches)
ASTM C -172
(days)
ASTM C -39
SAMPLE LOCATION: See placement location
CONCRETE CLASS: 163
PLACEMENT DATE: 06/09/1999 BATCH TIMiE: 3:37am
TIME SAMPLED: 4:10am BY: Lee Savage
WEATHER CONDITIONS: Warm
TEMPERATURE (F) - AIR 78 F CONCRETE: 95 F
TRUCK NO: 734 TICKET NO: 3085368
AIR CONTENT (%): 2.6 UNIT WEIGHT (pd): N/A
PLACEMENT LOCATION:
Paving -29 south, I east of northwest comer of paving
ACCUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4630
4290
4460
4820
5020
4920
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
91LL Page 1 of 4
REPORT OF TESTS
CYLINDER
MEASURED
MAXIMUM
MARKED
SLUMP
DATE
AGE
LOAD
SET NO.
(inches)
TESTED
(days)
(lbs. force)
1 1
7.00
06/16/1999
7
130970
1 2
7.00
06/16/1999
7
121260
Average
1 3
7.00
07/07/1999
28
136220
1 4
7.00
07/07/1999
28
142010
Average
Contractor
was advised of
low air and high
slump
ACCUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4630
4290
4460
4820
5020
4920
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
91LL Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST fDC
ENGIl IEEE ' M.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 06 /09/1999 Report No.: 9915823 Report Date
07/13/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
30W psi @ 28 Days
SLUMP:
3 - 5 "
AIR:
3 -6%
TEST METHOD:
ASTM C -143
4230
ASTM C -172
4370
ASTM C -39
SAMPLE LOCATION: See placen
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
2 1 6.00
2 2 6.00
lent location
R
DATE
TESTED
06/16/1999
06/16/1999
CONCRETE CLASS: 163
PLACEMENT DATE: 06/09/1999 BATCH TIME: 4:35am
TIME SAMPLED: 5:15am BY: Lee Savage
WEATHER CONDITIONS: Warm
TEMPERATURE (F) - AIR 79 F CONCRETE: 92 F
TRUCK NO: 975 TICKET NO: 3085380
AIR CONTENT (%): 2.2 UNIT wEIGHT (pcf): N/A
PLACEMENT LOCATION:
Paving- 5' south, 5' east of northwest corner of paving
EPORT OF TESTS
AGE
(Ma
7
7
2 3 6.00 07/07/1999 28
2 4 6.00 07/07/1999 28
ACCUMULATIVE YARDS: 10
MAXIMUM
COMPRESSIVE
LOAD
STRENGTH FRACTURE
(tbs. force)
(psi) TYPE
103870
3670
104880
3710
Average
3690
127230
4500
119580
4230
Average
4370
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
DILL Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST fDC
INGIlVFERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 06 /09/1999 Report No.: 9915823 Report Date
07/13/1999
Client No.: 26295000
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project No.: 94991134
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP:
3 -5"
AIR:
3-6%
TESTMETHOD:
ASTM C -143
7.00
ASTM C -172
7
ASTM C -39
SAMPLE LOCATION: See placement location
CYLINDER
MARKED
SET NO.
3 1
3 2
3 3
3 4
CONCRETE CLASS: 163
PLACEMENT DATE: 06/09/1999 BATCH TIME: 7:09am
TIME SAMPLED: 7:30am BY: Lee Savage
WEATHER CONDITIONS: Warm, breezy
TEMPERATURE (F) - AIR 80 F CONCRETE: 91 F
TRUCK NO: 975 TICKET NO: 3085405
AIR CONTENT (%): 2.6 UNIT WEIGHT (pd): N/A
PLACEMENT LOCATION:
Paving- 100' south, 69 east of northwest toner of paving
REPORT OF TESTS ACCUMULATIVE YARDS: 10
MEASURED
MAXIMUM
COMPRESSIVE
SLUMP
DATE
AGE
LOAD
STRENGTH
(inches)
TESTED
(days)
(lb& force)
(psi)
7.00
06/16/1999
7
90730
3210
7.00
06/16/1999
7
97240
3440
Average
3330
7.00
07/07/1999
28
133370
4720
7.00
07/07/1999
28
143380
5070
Average
4900
FRACTURE
TYPE
Y
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST fW
ENGIlVEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 06 /09/1999 Report No.: 9915823 Report Date
07/13/1999
Client No.: 26295000 Project No.: 94991134
Client: Ewing Properties, Inc.
Attn: Mark Morris
14990 Landmark Blvd, #300
Dallas TX 75240 -6729
Project: Tom Thumb
Denton Tap & Sandy Lake
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR:
Hill & Wilkinson
CONCRETE SUPPLIER:
Lattimore
PLANT:
3
SPECIFICATION REQUIREMENTS
STRENGTH:
3000 psi @ 28 Days
SLUMP.
3 -5"
AIR:
3-6%
TEST METHOD:
ASTM C -143
3 5.00
ASTM C -172
28
ASTM C -39
SAMPLE LOCATION:
CYLINDER
MARKED
SET
NO.
4
104970
4
2 5.00
4
7
4
4000
See placement location
CONCRETE CLASS: 163
PLACEMENT DATE 06/09/1999 BATCH Tim: 8:40am
TIME SAMPLED 9:15am BY: Lee Savage
WEATHER CONDITIONS: Warm
TEMPERATURE (F) - AIR 84 F CONCRETE: 94 F
TRUCK NO: 820 TICKET NO 3085414
AIR CONTENT (%): 2.4 UNIT wEIGHT (pct): N/A
PLACEMENT LOCATION:
Paving- I South, 129 east of northwest comer of paving
REPORT OF TESTS
M EASURED
SLUMP DATE
(inches) TESTED
AGE
(days)
ACCUMULATIVE YARDS: 10
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lbs. force) (psi) TYPE
1 5.00
06/16/1999
7
104970
3710
2 5.00
06/16/1999
7
113080
4000
Average
3860
3 5.00
07/07/1999
28
148700
5260
4 5.00
07/07/1999
28
153780
5440
Average
5350
Technician: Lee Savage
Report Distribution:
(1) Ewing Properties, Inc.
(1) S.0 Companies
(l) Tom Thumb Stores Division
(1) Michael F. Twichell, Inc.
Started: 3:00am Finished: 11:00am TITI" Engin c.
(1) Raymond L. Goodson, Jr. Engrs. �;
(1) Hill & Wilkinson, Inc. Euge a Harbour
(1) City of Coppell - Engr. Dept. Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
GILL Page 4 of 4