Loading...
Town Center L1B2-LR 990708REPORT OF REINFORCING STEEL INSPECTION f BC 8901 Carpenter Frwy., Suite #100 Dall Texas 75247 Date of Service: 07/08/99 Client No.: 26295000 Report No .: 9918604 Project No.: 94991134 Client: Ewing Properties, Inc. Project: Tom Thumb 14990 Landmark Blvd, #300 Denton Tap & Sandy Lake Dallas, TX 75240 -6729 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Contractors Locationslitems Inspected: Paving and east fire lane Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT laeirp Drawings Approved X Bar Length and Shape X Column Tied Properly Bar Size X Proper Bar Placement X T ies and Spaces de X Properly Tied X Stirrup Spacing/Type lean X Dowel Bars in Place X Welded Splices ean L—C, X Proper Bar Supports X Mechanical Splices of Bars X Lapped Splices X Proper Cover Discrepancies /Comments Technician: G. Dimock Reoort Distribution: (1) Ewing Properties, Inc. (1) S. C. Companies (1)Tom Thumb Stores Division (1) Michael F. Twitchell, Inc. Reinforcing steel was cleaned prior to completion of this inspection. started: See Report #9918541 (1) Raymond L. Goodson, Jr. Engrs. (1) Hill & Wilkinson, Inc. (1) City of Coppell - Engr. Dept. �. Engineering, Inc. l Paul D. Smith, P.E. Senior Project Engineer 309cr Ttus report is exclusive) for the use of the client indicated above and shall not be r produced in full without written approval of HBC Engineering, Inc.