Town Center L1B2-LR 990708REPORT OF REINFORCING STEEL INSPECTION
f BC
8901 Carpenter Frwy., Suite #100
Dall Texas 75247
Date of Service: 07/08/99
Client No.: 26295000
Report No .: 9918604
Project No.: 94991134
Client: Ewing Properties, Inc. Project: Tom Thumb
14990 Landmark Blvd, #300 Denton Tap & Sandy Lake
Dallas, TX 75240 -6729 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Contractors
Locationslitems Inspected: Paving and east fire lane
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED
CORRECT
INCORRECT
ITEMS INSPECTED
CORRECT
INCORRECT
ITEMS INSPECTED
CORRECT
INCORRECT
laeirp Drawings Approved
X
Bar Length and Shape
X
Column Tied Properly
Bar Size
X
Proper Bar Placement
X
T ies and Spaces
de
X
Properly Tied
X
Stirrup Spacing/Type
lean
X
Dowel Bars in Place
X
Welded Splices
ean
L—C,
X
Proper Bar Supports
X
Mechanical Splices
of Bars
X
Lapped Splices
X
Proper Cover
Discrepancies /Comments
Technician: G. Dimock
Reoort Distribution:
(1) Ewing Properties, Inc.
(1) S. C. Companies
(1)Tom Thumb Stores Division
(1) Michael F. Twitchell, Inc.
Reinforcing steel was cleaned prior to completion of this inspection.
started: See Report #9918541
(1) Raymond L. Goodson, Jr. Engrs.
(1) Hill & Wilkinson, Inc.
(1) City of Coppell - Engr. Dept.
�. Engineering, Inc.
l
Paul D. Smith, P.E.
Senior Project Engineer
309cr Ttus report is exclusive) for the use of the client indicated above and shall not be r produced in full without written approval of HBC Engineering, Inc.