Loading...
Town Center L1B2-LR 990602i -IN -PLACE DENSITY TESTING f 19C ENGINEMM, M. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/21/1999 Report No.: 9914181 Report Date 06/02/1999 Client No.: 26295000 Project No.: 94991134 Client: Ewing Properties, Inc. Project: Tom Thumb Attn: Mark Morris Denton Tap & Sandy Lake 14990 Landmark Blvd, #300 Dallas TX 75240 -6729 Coppell, Texas Services: In -place density testing. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2 PROJECT DATA CONTRACTOR: Hill & Wilkinson Laboratory Test Method: ASTM D -698 Field Test Method: ASTM D-2922 ASTM D -3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pef Moisture Density 1 Brown/yellow sandy clay 11.0 118.5 -143% 95% 2 Red/brown sandy clay 19.0 104.5 -143% 95% 3 Light/med brown clayey sand 15.0 119.0 -242% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. M (pcf) (% max) Line A, 18" R.C.P 56 1st lift, Station 0 +91 1 14.0 118.3 100 57 1st lift, Station 2 +35 2 18.6 99.7 95 58 1st lift, Station 1 +100 1 12.8 116.1 98 59 1st lift, Station 2 +100 2 18.0 100.6 96 Building Pad 60 Select fill, Grid line A.5/3, 2nd lift 3 14.2 115.4 97 61 Select fill, Grid line C13.5, 2nd lift .3 13.3 116.1 98 62 Select fill, Grid line E13, 2nd lift 3 15.2 113.3 95 63 Select fill, Grid line F /3, 2nd lift 3 13.0 117.7 99 64 Select fill, Grid line G/3.5, 2nd lift 3 13.4 115.1 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2