Belt Line Trade-LR061212 (2)
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCR CYLINDER TEST REPORT
Line Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: 101
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 166
REG PROJECT NO. 13335
SAMPLE DATE: 12-05-06
TECHNICIAN: J. Smith
PAGE: 1 of 1
CONTRACTOR: Raymond Construction
Location of Sam
Set Number
1
2
Ie
Location
Belt Line Northbound Turn Lane: 8T A 24+50
Belt Line Northbound Turn Lane: 8TA 23+75
Desi n Information
Source of Concrete
LMC
2
9203
9203
9203
9203
fat · to?
1" ~ 0
Date Tested
12-12-06
01-02-07
01-02-07
Hold
12-12-06
01-02-07
01-02-07
Hold
Mix Identification
1851
ecified Stren
4500
Total Load
Ibs.
111330
116290
4120
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Construction/
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Air
Entrainment
3.9
4.2
Ticket
Number
7173805
7173818
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MLllnc
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214J 3505600 . 'AX [214J 3500019