Loading...
Belt Line Trade-LR061212 (2) REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCR CYLINDER TEST REPORT Line Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: 101 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell REPORT NO. 166 REG PROJECT NO. 13335 SAMPLE DATE: 12-05-06 TECHNICIAN: J. Smith PAGE: 1 of 1 CONTRACTOR: Raymond Construction Location of Sam Set Number 1 2 Ie Location Belt Line Northbound Turn Lane: 8T A 24+50 Belt Line Northbound Turn Lane: 8TA 23+75 Desi n Information Source of Concrete LMC 2 9203 9203 9203 9203 fat · to? 1" ~ 0 Date Tested 12-12-06 01-02-07 01-02-07 Hold 12-12-06 01-02-07 01-02-07 Hold Mix Identification 1851 ecified Stren 4500 Total Load Ibs. 111330 116290 4120 Mail Distribution: (1) IDI/Mr. Chris Parnell (1) Raymond Construction/ Mr. David Layne (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Air Entrainment 3.9 4.2 Ticket Number 7173805 7173818 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214J 3505600 . 'AX [214J 3500019