Gateway BP(1.4)-LR061208ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings Approved
X
Bar Length and Shape
X
Column Tie Spacing Type
Bar Size
X
Proper Bar Placement
X
Stirrup Spacing Type
Bar Grade
X
Properly Tied
X
Welded Splices
Rebar Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash Debris Removed
X
Proper Bar Supports
X
Lapped Splices
X
Number of Bars
X
Proper Cover /Clearance
X
REPORT OF REINFORCING STEEL OBSERVATION
Date of Service: 12/08/06 Report No.: 94061357.0021
Client No.: 72873 Project No.: 94061357
Client: Hill Wilkinson LTD Project: Haverty Pavement Expansion
800 Klein Rd Ste 100 770 Gateway Blvd.
Plano, TX 75074 Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Civil Drawings C2.01, dated 10/03/06
Locations /Items Observed: Paving, NW corner of building
Test Method:
Discrepancies/Comments: Any discrepancies found were not corrected prior to the completion of this observation.
Reinforcing steel bars (rebar) installation was not completed at this time. Follow up
observation will be performed on 12/09/06.
Field Results Report To:
Technician:
J. Rojas
Report Distribution:
(1) Hill Wilkinson LTD
(1) Halff Assoc Inc
(1) City of Coppell TX
Visual Observation
REPORT OF OBSERVATION
rik cle7
(1) Haverty Furniture Co Inc
lierracon
Consulting Engineers Scientists
8901 Carpenter Frwy., Suite 4100
Dallas, Texas 75247
(2141630 -1010
Hussei H. Abusaad, P.E.
Senior Project Manager
309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.