SC-Coppell MSN-LR 980519FUGRO SOUTH, INC.
Im
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
FIELD DENSITY REPORT
CLIENT: Coppell ISD
PROJECT: Coppell Middle School North Sitework, Coppell, Texas
REPORT DATE:
PROJECT NO.:
May 19, 1998
0771 -2094
DATE PERFORMED: May 4, 1998
MOISTURE /DENSITY RELATIONS
Material
Proctor Results
Number
Description Maximum Dry Density (pcf) Optimum
Moisture ( %)
1
Crushed limestone flex base 121.8
12.1
TEST RESULTS
TEST
PROCTOR LOCATION UNIT DRY
MOISTURE
PERCENT OF
NO.
NO. WEIGHT CONTENT
PERCENT MAXIMUM DENSITY
220
1 Entrance off Denton top into middle 123.6
9.5
101.5
school, center of Intersection 25 feet off
Denton Tap, final
221
1 Entrance off Denton top into middle 116.7
9.4
95.8
school, north of Intersection shoulder area
in front of tree, final
222
1 Entrance off Denton top into middle 123.1
9.4
101.1
school, south of Intersection shoulder
area 15 feet north of tree, final
Remarks: All densities meet project specifications unless otherwise noted.
Mike Flute
Fugro South Technician
SMH /mv
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc. - E. J. Williams (2)
K A Sparks Contractors, Inc. - Jim Schooler
FUGRO SOUTH, INC.
Checked by:
City of Coppell - Garreth Campbell
SHW Group - Joe Craddock
SHW Group - Mike Elmore