Loading...
SC-Coppell MSN-LR 980427FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date April 27, 1998 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 [ SAMPLE DATE: April 15, 1998 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 615887 CONCRETE SUPPLIER: Pioneer 81 PLANT/TRUCK: 74 80 MIX ID NUMBER: 827 12:05 AIR ( %) (ASTM C -231) : LOAD 1:00 WATER ADDED (gal): 10 Partly cloudy SLUMP (in .) (ASTM C -143) : 5 Paving: Sidewalk, southwest corner of building, 10 feet south, 50 feet east 04/22/98 73100 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard' 6" x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 250 7 04/22/98 73100 2586 3000/28 days CNS 251 28 05/13/98 CNS 252 28 05/13/98 CNS 253 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of i Curing: i Methods: ASTM C-39 i Fracture: A® s C D REMARKS: Technician: Pompey McGee FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore