Loading...
SC-Coppell MSN-LR 980325FUGRO- McCLELLAND (SOUTH INC. FIELD DENSITY REPORT ■ GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 CLIENT: Coppell ISD REPORT DATE: March 25, 1998 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO.: 0771 -2094 Material Number Description 1 Tan, yellow, brown and gray shaley clay mix 2 Medium brown silty clay TEST RESULTS TEST NO. 216 PROCTOR LOCATION UNIT DRY NO. WEIGHT 1 Northeast corner of Tennis Court, final 106.8 MOISTURE CONTENT PERCENT 19.5 PERCENT OF MAXIMUM DENSITY 101.2 217 2 Southwest corner of Tennis Court, final 113.0 16.0 102.4 Remarks: All densities meet project specifications unless otherwise noted. Mike Flute Fug ro-McC lel land Technician MOISTURE /DENSITY RELATIONS Proctor Results Maximum Dry Density (pcf) Optimum Moisture ( %) 105.5 20.2 110.3 16.9 FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: - -- SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell F` K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST) INC. own 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 MOISTURE /DENSITY RELATIONSHIP OF SOILS CLIENT: Coppell ISD REPORT DATE: March 25, 1998 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094 SAMPLE DATE: March 11, 1998 METHOD OF TEST: SAMPLE IDENTIFICATION: Sample Description: Sample Origin: MOISTURE /DENSITY: Preparation Procedure: Rammer Description: Maximum Dry Density: (lbs /cu ft) Optimum Moisture Content ( %): ATTERBERG LIMITS: Liquid Limit: Plastic Limit: Plasticity Index: GRAIN SIZE: Percent Passing ( -200) Sieve: Mike Flute Fugro - McClelland Technician ASTM D-698A Reddish clayey silty sand (select) On site Moist Mechanical 123.4 11.0 17 11 6 27 FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore