SC-Coppell MSN-LR 980307FUGRO- McCLELLAND (SOUTHWEST), INC. --`
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: March 7 1998
PROJECT Coppell Elementary School #10, Coppell, Texas PROJECT NO: 0771 -2089
DATE PERFORMED: February 27, 1998
General Contractor: K. A. Sparks Contractors, Inc.
Method of Test Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Southeast parking area at the kitchen
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Burl Cooper
Fug ro- McC lei land Technician
SMH /mv
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
7:30 A.M.
10:30 A.M.
80
4 -5
3 -5
Pioneer
55 -63 °F
4000/28
4
No
FUGRO McCLELLAND (SOUTHWEST), INC.
Checked By:_�
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore