Loading...
SC-Coppell MSN-LR 980307FUGRO- McCLELLAND (SOUTHWEST), INC. --` 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE: March 7 1998 PROJECT Coppell Elementary School #10, Coppell, Texas PROJECT NO: 0771 -2089 DATE PERFORMED: February 27, 1998 General Contractor: K. A. Sparks Contractors, Inc. Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Southeast parking area at the kitchen following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Burl Cooper Fug ro- McC lei land Technician SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. 7:30 A.M. 10:30 A.M. 80 4 -5 3 -5 Pioneer 55 -63 °F 4000/28 4 No FUGRO McCLELLAND (SOUTHWEST), INC. Checked By:_� City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore