Loading...
SC-Coppell MSN-LR 980203�IGRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date February 3, 1998 PROJECT Coppell Elementary School #10, Coppell, Texas Project No .: 0771 -2089 SAMPLE DATE: January 22, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K.A Sparks 547153 CONCRETE SUPPLIER: Pioneer 43 PLANT/TRUCK: TOTAL 60 MIX ID NUMBER: 9337 11:40 a.m AIR ( %) (ASTM C -231) : LOAD 12:25 a.m WATER ADDED (gal): 0 Partly cloudy SLUMP (in .) (ASTM C -143) : 5 Compressor pad at northwest corner of building (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH. TESTS Standard 6" x 12 ",,28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CES 235 7 1/29/98 125000 4421 3000/28 days CES 236 28 2/19/98 CES 237 28 2/19/98 CES 238 Hold Fracture mode is (A) unless otherwise noted Specifications: '• Making & ASTM C -31 Testing ASTM C- 143, `• Types of Fracture: A® Z 0 Curing: Methods: ASTM C -39 B C D REMARKS: Technician: Skip Martin/ Roosevelt Webber FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore