Loading...
SC-Coppell MSN-LR 980120N al FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 20, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: January 2, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group inc 588861 CONCRETE SUPPLIER: Pioneer 54 PLANT/TRUCK: 27 -582 65 MIX ID NUMBER: 9351 9:15 a.m AIR ( %) (ASTM C -231) : LOAD 9:58 a.m WATER ADDED (gal): NUMBER Cloudy SLUMP (in.) (ASTM C -143) : 4 120 yards north of Natches Trace Dr. On fire lane on west side of school 7 1/9/98 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square incites TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 242 7 1/9/98 3714 3000 3000/28 days CNS 243 28 1/30/98 CNS 244 28 1/30/98 CNS 245 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C -143, Types of Fracture: D Curing: Methods: ASTM C -39 I A® B® C REMARKS: Technician: William Granger FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore