Loading...
SC-Coppell MSN-LR 980102— ruGRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542341 CONCRETE SUPPLIER: Pioneer 75 PLANTITRUCK: 74/836 69 MIX ID NUMBER: 9351 3:06 AIR ( %) (ASTM C -231) : 5.5 3:55 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 5 1/2 Fire lane, south end drive, curbs and last of intersection halfway to parking lot 7 12/24/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 206 7 12/24/97 90000 3183 3000/28 days CNS 207 28 01/14/98 CNS 208 28 01/14/98 CNS 209 Hold Fracture mode is (A) unless otherwise noted Specifications: ; Making & ASTM C -31 Testing ASTM C -143, ; Types of j Curing: i Methods: ASTM C -39 i Fracture: A® B® C D REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore own r FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542332 CONCRETE SUPPLIER: Pioneer 75 PLANT/TRUCK: 74/498 70 MIX ID NUMBER: 9351 2:30 AIR ( %) (ASTM C -231) : 5.5 3:15 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 6 Fire lane, south end drive intersection (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 201 7 12/24/97 90000 3183 3000/28 days CNS 202 28 01/14/98 CNS 203 28 01/14/98 CNS 204 Hold Fracture mode is (A) unless otherwise noted Specifications: ! Making & ASTM C -31 Testing ASTM C -143, ! Types of Z Curing: ; Methods: ASTM C -39 i Fracture: A® B® C D REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore E FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542325 CONCRETE SUPPLIER: Pioneer 88 PLANT/TRUCK: 74/499 79 MIX ID NUMBER: 9351 1:43 AIR ( %) (ASTM C -231) : 6 2:45 WATER ADDED (gal): 5 Sunny /clear SLUMP (in.) (ASTM C -143) : 5 1/2 Pavement on grade, intersection of southwest fire lane and south drive curbs CNS 197 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 197 7 12/24/97 90000 3183 3000/28 days CNS 198 28 01/14/98 CNS 199 28 01/14/98 CNS 200 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 ! Testing ASTM C -143, ! Types of Fracture: Z i Curing: j Methods: ASTM C -39 A® B® C D REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: f SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542317 CONCRETE SUPPLIER: Pioneer 88 PLANT/TRUCK: 831 77 MIX ID NUMBER: 9351 1:05 AIR ( %) (ASTM C -231) : 6 1:37 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 6 Southwest fire lane nearest building south end of lane CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 193 7 12/24/97 97000 3431 3000/28 days CNS 194 28 01/14/98 CNS 195 28 01/14/98 CNS 196 Hold Fracture mode is (A) unless otherwise noted Specifications: ! Making & ASTM C -31 Testing ASTM C -143, Types of z Curing: ; Methods: ASTM C -39 i Fracture: A® B® C D REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore �GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date: January 2 1998 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542312 CONCRETE SUPPLIER: Pioneer PLANT/TRUCK: 74/754 MIX ID NUMBER: 9351 AIR ( %) (ASTM C - 231) : 6 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C-143): 53/4 Fire lane southwest side nearest building middle of fire lane CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 189 7 12/24/97 90000 3183 3000/28 days CNS 190 28 01/14/98 CNS 191 28 01/14/98 CNS 192 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Z i Curing: ; Methods: ASTM C -39 i A® B® C D REMARKS: Unit Weight: 144 lbs. /cu. ft. Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SO UTHWEST), INC. 21 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 1`7, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 535131 CONCRETE SUPPLIER: Pioneer 78 PLANTITRUCK: 27/491 70 MIX ID NUMBER: 9351 11:18 AIR ( %) (ASTM C -231) : 6.1 11:36 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 53/4 Pavement on grade, parking lot middle section (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 185 7 12/24/97 105000 3714 3000/28 days CNS 186 28 01/14/98 CNS 187 28 01/14/98 CNS 188 Hold Fracture mode is (A) unless otherwise noted Specifications: ! Making & ASTM C -31 Testing ASTM C -143, ! Types of ® ® Curing: ; Methods: ASTM C -39 Fracture: A B C D REMARKS: Unit Weight: 144 lbs. /cu. ft. Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore �6R0 FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 - 2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 535116 CONCRETE SUPPLIER: Pioneer 68 PLANT/TRUCK: 27/827 66 MIX ID NUMBER: 9351 10:12 AIR ( %) (ASTM C -231) : 6.1 10:33 WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 61/4 Pavement on grade, drive on south of building near corner (southwest) southwest of building 12/24/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 181 7 12/24/97 90000 3183 3000/28 days CNS 182 28 01/14/98 CNS 183 28 10/14/98 CNS 184 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 11 Curing: ; Methods: ASTM C -39 i Fracture: A® B C D REMARKS: Unit Weight: 144 lbs. /cu. ft. Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By /— --- SM H /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUT HWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell [SD Report Date January 2, 1998 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542282 CONCRETE SUPPLIER: Pioneer 65 PLANT/TRUCK: 74/827 68 MIX ID NUMBER: 9351 9:12 am AIR ( % ) (ASTM C - 231) : 5.5 9:45 am WATER ADDED (gal): 0 Sunny /clear SLUMP (in.) (ASTM C -143) : 6 Pavement on grade, parking lot, north section of west parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 177 7 12/24/97 83000 2035 3000/28 days CNS 178 28 01/14/98 CNS 179 28 01/14/98 CNS 180 Hold Fracture mode is (A) unless otherwise noted Specifications: i Making & ASTM C -31 Testing ASTM C -143, ! Types of Z i Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Unit Weight: 144 lbs. /cu. ft. Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: �— SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore 0 FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 - 2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 542272 CONCRETE SUPPLIER: Pioneer 53 P LANTITRU C K: 74/521 60 MIX ID NUMBER: 9351 7:30 AIR ( % ) (ASTM C - 231) : 5.5 8:20 WATER ADDED (gal): 3 Sunny /clear SLUMP (in.) (ASTM C -143) : 6 1/4 Pavement on grade, drive on south end of building approximately 30 feet from 1/2 mark of building 12/24/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 173 7 12/24/97 80000 2829 3000/28 days CNS 174 28 01/14/98 CNS 175 28 01/14/98 CNS 176 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 ! Testing ASTM C -143, ! Types of 2 i Curing: j Methods: ASTM C -39 Fracture: A® B C Z D REMARKS: Unit Weight: 144 Ibs /cu. ft. Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: - --,� - SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542264 CONCRETE SUPPLIER: Pioneer 48 PLANT/TRUCK: 74/521 50 MIX ID NUMBER: 9351 6:45 AIR ( %) (ASTM C -231) : 5.5 7:20 WATER ADDED (gal): 5 Sunny /clear SLUMP (in.) (ASTM C -143) : 51/2 Pavement on grade, curb for parking lot CNS 169 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 169 7 12/24/97 97000 3431 3000/28 days CNS 170 28 01/14/98 CNS 171 28 01/14/98 CNS 172 Hold Fracture mode is (A) unless otherwise noted Specifications: ! Making & ASTM C -31 Testing ASTM C -143, ! Types of Z Curing: ; Methods: ASTM C -39 i Fracture: A® B® C D REMARKS: Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore 2 Gnu FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 2, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 542347 CONCRETE SUPPLIER: Pioneer 72 PLANT/TRUCK: 74/831 66 MIX ID NUMBER: 9351 3:50 AIR ( %) (ASTM C -231) : 5.6 4:30 WATER ADDED (gal): 5 Sunny /clear SLUMP (in.) (ASTM C -143) : 6 Drive on south end of buildinI near fire plug (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH: TESTS Standard 6 "'x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 210 7 12/24/97 107000 3784 3000/28 days CNS 211 28 01/14/98 CNS 212 28 01/14/98 CNS 213 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of ® Z Curing: ; Methods: ASTM C -39 ; Fracture: A B C D REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore