Loading...
SC-Coppell MSN-LR 980101-- Fu"GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 1, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: December 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Coatez 542350 CONCRETE SUPPLIER: Pioneer 73 PLANTITRUCK: 74 -827 65 MIX ID NUMBER: 9351 4:01 p.m AIR ( %) (ASTM C -231) : 5.6 4:50 p.m WATER ADDED (gal): 0 Sunny / clear SLUMP (in.) (ASTM C -143) : 53/4 Drive on south end of building approxiamelty 50 feet from fire plug E. CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 214 7 12/24/97 110000 3891 3000/28 days CNS 215 28 1/14/98 CNS 216 28 1/14/98 CNS 217 Hold Fracture mode is (A) unless otherwise noted Specifications: ! Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Curing: i Methods: ASTM C -39 i A® B® C D REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUT HWEST), INC. can 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: January 1, 1998 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE December 18, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez 542428 CONCRETE SUPPLIER: Pioneer 68 PLANT/TRUCK: 74 -483 64 MIX ID NUMBER: 9351 1:30 p.m AIR ( %) (ASTM C -231) : LOAD 2:35 p.m WATER ADDED (gal): NUMBER Clear SLUMP (in.) (ASTM C -143) : 5 Fire lane on west side of school sampled at off of south end of east island CNS 230 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 230 7 12/26/97 90000 3183 3000/28 days CNS 231 28 1/15/98 CNS 232 28 1/15/98 CNS 233 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, ! Types of Z Curing: i Methods: ASTM C -39 j Fracture: A® B® C D REMARKS: Technician: William Granger FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore