SC-Coppell MSN-LR 971230N
I
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: December 30, 1997
PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
DATE PERFORMED. December '19, 1997
General Contractor: Cortez Group Inc.
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Fire lanes on west side of school
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
William Granger
Fugro - McClelland Technician
SMH /mv
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
7:00 A.M.
10:30 A.M.
200
5 -6
6
Pioneer
56 -60 °F
3000/28
8
No
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore