Loading...
SC-Coppell MSN-LR 971120F'UGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 752. Ph (972) 484 -8301; Fax (972) 620 -732 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: November 20, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 I SAMPLE DATE: October 21, 1997" CONTRACTOR: TICKET NO.: AMBIENT TEMP. CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 496120 CONCRETE SUPPLIER: Pioneer 58 PLANT/TRUCK: 74/562 74 MIX ID NUMBER: 9351 8:31 AIR ( %) ( ASTM C -231) : 9:05 WATER ADDED (gal): 0 Cloudy SLUMP (in.) (ASTM C -143) : 4.75 Paving: 50 Feet north and 5 feet east from west curb on road on west side of elementary running north from Natches Trace CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 11 , 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 137 7 10/28/97 90000 3183 3000/28 days CNS 138 28 11/18/97 133000 4704 CNS 139 28 11/18/97 127000 4492 CNS 140 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of ® Curing: Methods: ASTM ® C -39 Fracture: A B C D REMARKS: Technician. Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B . SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore �GRO FUGRO- McCLELLAND (SOUTHWEST), INC. --- 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: November 20, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE October 21 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( ° F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 496103 CONCRETE SUPPLIER: Pioneer 57 PLANTITRUCK: 74/826 75 MIX ID NUMBER: 9351 6:55 AIR ( % ) (ASTM C -231) : LOAD 7:40 WATER ADDED (gal): 20 Cloudy SLUMP (in .) (ASTM C -143) : 5 Paving, east road going north from Natches Trace approximately 125 feet north from Natches west side of road 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 133 7 10/28/97 95000 3360 3000/28 days CNS 134 28 11/18/97 157000 4492 CNS 135 28 11118/97 130000 4598 CNS 136 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® E E E Curing: Methods: ASTM C -39 B C D REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. �—`- 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: November 20, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 21, 199T' CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 496130 CONCRETE SUPPLIER: Pioneer 56 PLANTITRUCK: 74/836 73 MIX ID NUMBER: 9351 9:22 AIR ( %) (ASTM C -231) LOAD 10:08 WATER ADDED (gal): 0 Cloudy SLUMP (in .) (ASTM C -143) : 4.75 Paving: 10 feet north and 5 feet east from west curb on road west side of elementary north from Natches Trace 10/28/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 141 7 10/28/97 93000 3289 3000/28 days CNS 142 28 11/18/97 123000 4350 CNS 143 28 11/18/97 120000 4244 CNS 144 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® Z 0 Curing: Methods: ASTM C -39 [ B® C D REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: November 20, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project NO.: 0771 -2094 SAMPLE DATE October 21 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 496138 CONCRETE SUPPLIER: Pioneer 59 PLANTITRUCK: 74/565 71 MIX ID NUMBER: 9351 AIR ( %) (ASTM C -231) : 11:00 WATER ADDED (gal): 0 Cloudy SLUMP (in.) (ASTM C -143) : 5 Paving: North connection of 2 parking areas between schools, 5 feet south from center point of north radius CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 145 7 10/28/97 80000 2829 3000/28 days CNS 146 28 11/18/97 117000 4138 CNS 147 28 11/18/97 115000 4067 CNS 148 Hold Fracture mode is (A) unless otherwise noted Specifications: I Making & ASTM C -31 Testing ASTM C -143, Types of Z Curing: Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B --� SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore