Loading...
SC-Coppell MSN-LR 971116FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date November 16, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project NO.: 0771 -2094 SAMPLE DATE: October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Tiseo Paving CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS CONCRETE SUPPLIER: Tiseo 53 PLANT /TRUCK: 1/118 72 MIX ID NUMBER: 34 7:15 am AIR ( %) (ASTM C -231) : 5.2 8:35 am WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 4.25 Paving: Perimeter Road westbound lane, 370 feet east of Denton Tap 7 10/23/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 89 7 10/23/97 145000 5129 3000/28 days CNS 90 28 11/13/97 180000 6367 CNS 91 28 11/13/97 185000 6544 CNS 92 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Z a Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Jason Brimingham FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore