Loading...
SC-Coppell MSN-LR 971113�GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date November 13, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 31, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 5000107 CONCRETE SUPPLIER: Pioneer 65 PLANT/TRUCK: 74/829 75 MIX ID NUMBER: 9351 7:00 am AIR ( %) (ASTM C -231) : 5.2 7:50 am WATER ADDED (gal): 20 STRENGTH (psi) SLUMP (in .) (ASTM C -143) : 5.5 Paving: Southeast parking lot behind elementary school (north driveway 100 feet from east service road 3000/28 days REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B , SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER NUMBER AGE (days) DATE TESTED LOAD (pounds) STRENGTH (psi) STRENGTH (psi) CNS 157 7 11/07/97 90000 3183 3000/28 days CNS 158 28 11/28/97 CNS 159 28 11/28/97 CNS 160 Specifications: Hold Making & Curing: Fracture mode is (A) unless otherwise noted ASTM C -31 Testing ASTM C -143, ;Types of Z Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B , SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore — fu'GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: November 13, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 31, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 500119 CONCRETE SUPPLIER: Pioneer 67 PLANT /TRUCK: 74/829 76 MIX ID NUMBER: 9351 8:35 am AIR ( %) (ASTM C -231) : 5.8 9:25 am WATER ADDED (gal): 20 Clear SLUMP (in.) (ASTM C -143) : 5.5 Paving: South parking lot behind elementary (west entrance) REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked R,= SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER NUMBER AGE (days) DATE TESTED LOAD (pounds) STRENGTH (psi) STRENGTH (Psi) CNS 161 7 11/07/97 80000 2829 3000/28 days CNS 162 28 11/28/97 CNS 163 28 11/28/97 CNS 164 Hold Specifications: Making 8 Curing: ASTM C -31 Fracture mode is (A) unless otherwise noted Methods: ASTM C -39 Fracture: A® B® C D a REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked R,= SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore �GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISO Report Date November 13, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 - 2094 (— SAMPLE DATE: October 31, 1997 f CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 500132 CONCRETE SUPPLIER: Pioneer 70 PLANT /TRUCK: 74 75 MIX ID NUMBER: 9351 9:30 am AIR ( %) (ASTM C -231) : 5.3 10:35 am WATER ADDED (gal): 20 Clear SLUMP (in.) (ASTM c -143) : 5.5 Paving: South parking lot - elementary west driveway entrance REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISO - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER NUMBER AGE (days) DATE TESTED LOAD (pounds) STRENGTH (psi) STRENGTH (psi) CNS 165 7 11/07/97 85000 3006 3000/28 days CNS 166 28 11/28/97 CNS 167 28 11/28/97 CNS 168 Hold Specifications: I Making & Curing: ASTM C -31 Fracture mode is (A) unless otherwise noted Testing ASTM C -143, Types of Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISO - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore