GENERAL REPORT
CLIENT: Coppell ISD REPORT DATE: November 7 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094
DAILY ACTIVITY REPORT: November 1,_1997
Services Performed Visual Inspection
Weather Conditions Clear
Contractors on Site: K. A. Sparks
Remarks On this date, a representative of Fugro - McClelland was present on the above mentioned project
to perform the following tests and observations as requested:
Soils:
• 4 gradation test were performed on the lime treated material for northwest parking are south section and Fire
lane.
• Also on Fire lane at east of northwest parking area.
Jose Rivera
Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC.
c�
Saad M. Hineidi, P.E.
Vice President
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
��aRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
LIME STABILIZED SOIL PULVERIZATION REPORT
CLIENT: Coppell ISD REPORT DATE: November 7 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094
DATE PERFORMED: November 1, 1'99?'
Contractors on Site: K. A. Sparks Contractors Inc.
Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below
LIME STABILIZED SOIL PULVERIZATION TEST RESULTS
Percent Passing Percent Passing
Location 1 3/4" Sieve #4 Sieve
1 North Fire lane, 100 feet east of 100 60
northwest parking
2 North Fire lane, 50 feet north of 100 70
parking
3 Northwest parking area, 50 feet north 100 72
of south end
4 West Fire lane, 75 feet north of south 100 75
parking
Project Requirements: Minimum 100% Minimum 60%
SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve
SDHPT Item 260.4 (1982) 3/4" Sieve
Jose Rivera
Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By;
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST) INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: November 7 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
DATE PERFORMED: October 31, 1997
General Contractor: K. A. Sparks
Method of Test Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the South parking lot behind Elem
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Daniel Myers
Fugro - McClelland Technician
7:00 A.M.
11:00 P.M.
420
5.5
4 -6
Pioneer
70 °F
3000/28
12
No
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked Bv:
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell —
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore