Loading...
SC-Coppell MSN-LR 971107�GRO FUGRO- McCLELLAND (SOUTHWEST), INC. — � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 GENERAL REPORT CLIENT: Coppell ISD REPORT DATE: November 7 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094 DAILY ACTIVITY REPORT: November 1,_1997 Services Performed Visual Inspection Weather Conditions Clear Contractors on Site: K. A. Sparks Remarks On this date, a representative of Fugro - McClelland was present on the above mentioned project to perform the following tests and observations as requested: Soils: • 4 gradation test were performed on the lime treated material for northwest parking are south section and Fire lane. • Also on Fire lane at east of northwest parking area. Jose Rivera Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. c� Saad M. Hineidi, P.E. Vice President SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. ��aRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE: November 7 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094 DATE PERFORMED: November 1, 1'99?' Contractors on Site: K. A. Sparks Contractors Inc. Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing Location 1 3/4" Sieve #4 Sieve 1 North Fire lane, 100 feet east of 100 60 northwest parking 2 North Fire lane, 50 feet north of 100 70 parking 3 Northwest parking area, 50 feet north 100 72 of south end 4 West Fire lane, 75 feet north of south 100 75 parking Project Requirements: Minimum 100% Minimum 60% SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve Jose Rivera Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By; SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST) INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE: November 7 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094 DATE PERFORMED: October 31, 1997 General Contractor: K. A. Sparks Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the South parking lot behind Elem following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Daniel Myers Fugro - McClelland Technician 7:00 A.M. 11:00 P.M. 420 5.5 4 -6 Pioneer 70 °F 3000/28 12 No FUGRO- McCLELLAND (SOUTHWEST), INC. Checked Bv: SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell — K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore