SC-Coppell MSN-LR 971105Gnu
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: November 5, 1997
PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
DATE PERFORMED': October 29, 1997'
General Contractor: K. A. Sparks
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
At drive at east side of Middle School, north end of
drive, completion of radius and also paved, was
approach to Public Road at east side of Elem., first
approach south of 533
7:10 A.M.
10:50 A.M.
142
4.50 -4.75
3 -5
Pioneer -74
78 °F
3000/28
8
No
Scott Rogers
Fugro - McClelland Technician
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore