SC-Coppell MSN-LR 971105Gnu FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE: November 5, 1997 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094 DATE PERFORMED': October 29, 1997' General Contractor: K. A. Sparks Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: At drive at east side of Middle School, north end of drive, completion of radius and also paved, was approach to Public Road at east side of Elem., first approach south of 533 7:10 A.M. 10:50 A.M. 142 4.50 -4.75 3 -5 Pioneer -74 78 °F 3000/28 8 No Scott Rogers Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore