SC-Coppell MSN-LR 971029FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October '21, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group
496138 CONCRETE SUPPLIER: Pioneer
59 PLANT /TRUCK: 74/565
71 MIX ID NUMBER: 9351
AIR ( %) ( ASTM C -231) :
11:00 WATER ADDED (gal): 0
Cloudy SLUMP (in.) (ASTM C -143) : 5
Paving: North connection of 2 parking areas between schools, 5 feet
south from center point of north radius
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 145
7
10/28/97
80000
2829
3000/28 days
CNS 146
28
11/18/97
CNS 147
28
11/18/97
CNS 148
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31
Testing ASTM C -143, Types of
I Fracture: A® Z 0
Curing:
Methods: ASTM C -39 B® C D
REMARKS:
Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked y
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094
SAMPLE DATE: September '30, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc
491850
CONCRETE SUPPLIER:
Pioneer
74
PLANT /TRUCK:
74/384
86
MIX ID NUMBER:
9339
6:30
AIR ( % ) (ASTM C -231) :
5.0
7:00
WATER ADDED (gal):
5
Clear
SLUMP (in.) (ASTM C -143) :
5
Fire lane southwest
parking area approximately
150 feet south, 100
feet west of southwest corner of building
10/07/97
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6 "x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 17
7
10/07/97
87000
3077
3000/28 days
CNS 18
28
10/28/97
115000
4067
CNS 19
28
10/28/97
121000
4280
CNS 20
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
:Making & ASTM C -31
:Testing ASTM C -143, Types of
Z 0
Curing:
: Methods: ASTM C -39 Fracture: A® B C D
REMARKS:
Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B ---
S M H /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: September 30, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc.
Standard 6" x 12 ", 28.27 square inches
491862
CONCRETE SUPPLIER:
Pioneer
75
PLANT /TRUCK:
74/829
86
MIX ID NUMBER:
9339
8:15
AIR ( %) (ASTM C -231) :
5.5
9:00
WATER ADDED (gal):
0
Clear
SLUMP (in.) (ASTM c -143) :
43/4
Fire lane approximately 150 feet south, 100 feet west of southwest
corner of building
72000
2546
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 13
7
10/07/97
72000
2546
3000/28 days
CNS 14
28
10/28/97
103000
1 3643
CNS 15
28
10/28/97
107000
3784
C NS 16
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
& ASTM C -31
® ® Z
Curing:
Methods: ASTM C -39 Fracture: A a C D
REMARKS:
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By -
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC. 0=
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: September 30, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc.
491853 CONCRETE SUPPLIER: Pioneer
76 PLANT /TRUCK: 74/525
86 MIX ID NUMBER: 9339
7:04 AIR ( %) ( ASTM C -231) : 5.5
8:05 WATER ADDED (gal): 0
Clear SLUMP (in.) (ASTM c -143) : 5
Fire lane approximately 200 feet south, 150 feet west of southwest
corner of building
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 9
7
10/07/97
70000
2476
3000/28 days
CNS 10
28
10/28/97
110000
3891
CNS 11
28
10/28/97
105000
3714
CNS 12
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
Z
Curing: Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: September 30, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc.
491878 CONCRETE SUPPLIER: Pioneer
80 PLANT /TRUCK: 74/499
87 MIX ID NUMBER: 9339
10:21 am AIR ( %) (ASTM C -231) : 5.0
11:30 am WATER ADDED (gal): 0
Clear SLUMP (in.) (ASTM c -143) : 5
Fire lane approximately 300 feet south, 100 feet west of southwest
corner of building
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS'
Standard 6" x 12", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 29
7
10/07/97
91000
3218
3000/28 days
CNS 30
28
10/28/97
115000
4067
CNS 31
28
10/28/97
117000
4138
CNS 32
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
Z
Curing: Methods: ASTM C -39 Fracture: A® B C D
REMARKS:
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By 1 _
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE': September 30, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc.
491867 CONCRETE SUPPLIER: Pioneer
78 PLANT /TRUCK: 74/385
85 MIX ID NUMBER: 9339
8:30 AIR ( %) ( ASTM C -231) : 5
9:45 WATER ADDED (gal): 0
Clear SLUMP (in.) (ASTM C -143) : 41/2
Fire lane approximately 75 feet south, 50 feet west of southwest
corner of building
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS<
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 25
7
10/07/97
98000
3466
3000/28 days
CNS 26
28
10/28/97
127000
4492
CNS 27
28
10/28/97
130000
4598
CNS 28
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
E
Curing: Methods: ASTM C -39 Fracture: A® B C D
REMARKS:
Technician: Burl Cooper FUGRO- MCCLELLAND (SOUTHWEST), INC.
Checked By 1
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094
SAMPLE DATE: September 30, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc.
Standard 6" x 12 28.27 square inches
491858
CONCRETE SUPPLIER:
Pioneer
74
PLANT /TRUCK:
74/734
84
MIX ID NUMBER:
9339
7:38
AIR ( % ) (ASTM C -231) :
5
8:30
WATER ADDED (gal):
20
Clear
SLUMP (in.) (ASTM c -143) :
43/4
Fire lane approximately 75 feet south, 90 feet west of southwest
corner of building
63000
2228
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNN 21
7
10/07/97
63000
2228
3000/28 days
CNS 22
28
10/28/97
110000
3891
CNS 23
28
10/28/97
113000
3997
CNS 24
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
& ASTM C -31
® ® Z
' Curing: Methods: ASTM C -39 Fr ctu e A B C D
REMARKS:
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B t--
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( ° F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522270
CONCRETE SUPPLIER:
Pioneer
80
PLANT /TRUCK:
27
90
MIX ID NUMBER:
9351
9:50 am
AIR ( %) (ASTM c -231) :
5.50
10:40 am
WATER ADDED (gal):
0
Partly cloudy
SLUMP (in.) (ASTM c -143) :
3.50
Paving: Station 18 +90, Perimeter Road
(psi)
CONCRETE CYLINDER' COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ",; 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 37
7
10/08/97
126000
4457
3000/28 days
CNS 38
28
10/29/97
150000
5305
CNS 39
28
10/29/97
147000
5199
CNS 40
Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C -31
Testing ASTM C -143, Types of
z
Curing:
Methods: ASTM C -39 Fracture: A® B c D
REMARKS:
Technician: Bob Shea
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTH INC.
�GRO
0
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project NO.: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522265
CONCRETE SUPPLIER:
Pioneer
81
PLANT /TRUCK:
27/549
89
MIX ID NUMBER:
9351
8:10 am
AIR ( % ) (ASTM C -231) :
5.7
9:00 am
WATER ADDED (gal):
0
Overcast
SLUMP (in .) (ASTM C -143) :
4.50
Paving:
Perimeter Road, station 1 +00
CNS 33
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 33
7
10/08/97
122000
4316
3000/28 days
CNS 34
28
10/29/97
143000
5058
CNS 35
28
10/29/97
140000
4952
CNS 36
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, I Types of
I Curing: Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST) INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522287
CONCRETE SUPPLIER:
Pioneer
85
PLANT /TRUCK:
27
91
MIX ID NUMBER:
9351
11:30 am
AIR ( %) (ASTM C -231)
LOAD
12:15 pm
WATER ADDED (gal):
0
Partly cloudy
SLUMP (in.) (ASTM C -143) :
5
Paving: Perimeter Road, station 19 +90
(psi)
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS`
Standard 6" x12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 41
7
10/08/97
85000
3007
3000/28 days
CNS 42
28
10/29/97
128000
4527
CNS 43
28
10/29/97
130000
1 4598
CNS 44
Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C -31 Testing ASTM C- 143, Types of
Z
Curing: Methods: ASTM C -39 Fracture: A® BE C D
REMARKS:
Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522295
CONCRETE SUPPLIER:
Pioneer
85
PLANT /TRUCK:
27
92
MIX ID NUMBER:
9351
12:10 pm
AIR ( % ) (ASTM C -231) :
5.2
12:34 pm
WATER ADDED (gal):
10
Partly cloudy
SLUMP (in.) (ASTM C -143) :
5
Paving: Perimeter Road, station 20 +50
(psi)
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 45
7
10/08/97
100500
3555
3000/28 days
CNS 46
28
10/29/97
120000
4244
CNS 47
28
10/29/97
118000
4174
CNS 48
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, :Types of
Z E
Curing: Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Bob Shea
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522303
CONCRETE SUPPLIER:
Pioneer
85
PLANT /TRUCK:
27
92
MIX ID NUMBER:
9351
12:30 pm
AIR ( % ) (ASTM C -231)
LOAD
1:15 pm
WATER ADDED (gal):
0
Partly cloudy
SLUMP (in .) (ASTM C -143) :
4
Paving: Perimeter Road, station 21 +40
(psi)
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 49
7
10/08/97
124000
4386
3000/28 days
CNS 50
28
10129/97
145000
1 5129
CNS 51
28
10/29/97
140000
4952
CNS 52
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C- 143, Types of
0 Z
'
Curing: Methods: ASTM C -39 Fracture: A® B C D
REMARKS:
Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 1, 1997'
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522315
CONCRETE SUPPLIER:
Pioneer
86
PLANT /TRUCK:
27
93
MIX ID NUMBER:
9351
1:35 pm
AIR ( %) (ASTM C -231)
LOAD
2:15 pm
WATER ADDED (gal):
0
Partly cloudy
SLUMP (in.) (ASTM C -143) :
3.50
paving: Perimeter
Road, station 22 +45
CNS 53
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 53
7
10/08/97
107000
3785
3000/28 days
CNS 54
28
1 10/29/97
135000
4775
CNS 55
28
10/29/97
137000
4846
CNS 56
Hold
Fracture mode is (A) unless otherwise noted
pecifications: Making & ASTM C -31 Testing ASTM C -143, Types of
L s
Curing: Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Bob Shea
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELL (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522318
CONCRETE SUPPLIER:
Pioneer
86
PLANT /TRUCK:
27/278
92
MIX ID NUMBER:
9351
2:05 pm
AIR ( %) (ASTM c -231) :
5.5
2:45 pm
WATER ADDED (gal):
0
Partly cloudy
SLUMP (in.) (ASTM C -143) :
4
Paving: Perimeter Road, station 23 +00
(psi)
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 57
7
10/08/97
103500
3661
3000/28 days
CNS 58
28
1 10/29/97
133000
4704
CNS 59
28
10/29/97
137000
4846
CNS 60
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
Z
Curing: Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Bob Shea FUGRO- McCLE — LAND (SOUTHWEST), INC.
Checked B f'-
SMH/rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT Coppell ISD Report Date October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 1, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522331
CONCRETE SUPPLIER:
Pioneer
86
PLANT /TRUCK:
27
94
MIX ID NUMBER:
9351
3:00 pm
AIR ( % ) (ASTM C -231)
LOAD
3:35 pm
WATER ADDED (gal):
0
Partly cloudy
SLUMP (in.) (ASTM C -143) :
4
Paving: Perimeter Road, station 23 +85
(psi)
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 61
7
10/08/97
100000
3537
3000/28 days
CNS 62
28
1 10/29/97
135000
4775
CNS 63
28
10/29/97
137000
4846
CNS 64
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
Curing: E Methods: ASTM C -39 Fracture: A® B C D
REMARKS:
Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked Bye
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group" Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT Coppell ISD Report Date October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 - 2094
SAMPLE DATE: October 1 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( ° F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522335
CONCRETE SUPPLIER:
Pioneer
86
PLANT /TRUCK:
27/486
93
MIX ID NUMBER:
9351
3:30 pm
AIR ( % ) (ASTM C -231) :
5.9
4:10 pm
WATER ADDED (gal):
0
Clear
SLUMP (in.) (ASTM C -143) :
3.50
Paving:
Perimeter Road, station 24 +30
CNS 65
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6 "x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 65
7
10/08/97
126000
4457
3000/28 days
CNS 66
28
10/29/97
137000
4846
CNS 67
28
10/29/97
140000
4952
CNS 68
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
z
Curing: Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked 13
SMH /mn
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTH INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094
SAMPLE DATE: October 1`, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K. A. Sparks Contractors, Inc.
522344
CONCRETE SUPPLIER:
Pioneer
90
PLANT /TRUCK:
27/0
94
MIX ID NUMBER:
9351
4:00 pm
AIR ( % ) (ASTM C -231) :
5.5
4:45 pm
WATER ADDED (gal):
0
Clear
SLUMP (in.) (ASTM C -143) :
5.0
Paving:
Perimeter Road, station 25 +20
CNS 69
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 69
7
10/08/97
112500
3979
3000/28 days
CNS 70
28
10/29/97
133000
4704
CNS 71
28
10/29/97
130000
4598
CNS 72
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31
Testing ASTM C -143, 1 Types of
Z 0
Curing:
Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 21,_ 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group
496130
CONCRETE SUPPLIER:
Pioneer
56
PLANT /TRUCK:
74/836
73
MIX ID NUMBER:
9351
9:22
AIR ( %) (ASTM C -231)
LOAD
10:08
WATER ADDED (gal):
0
Cloudy
SLUMP (in.) (ASTM C -143) :
4.75
Paving:
10 feet north and 5 feet east from west
curb on road west
side of elementary
north from Natches Trace
93000
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6 "x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 141
7
10/28/97
93000
3289
3000/28 days
CNS 142
28
11/18/97
CNS 143
28
11/18/97
CNS 144
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31
Testing ASTM C -143, Types of
Z
Curing:
Methods: ASTM C -39 Fracture: A® B® C D
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
— fu'GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 29, 1997
PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094
SAMPLE DATE: October 21, 1997`
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group
496120 CONCRETE SUPPLIER: Pioneer
58 PLANT /TRUCK: 74/562
74 MIX ID NUMBER: 9351
8:31 AIR ( %) ( ASTM C -231)
9:05 WATER ADDED (gal): 0
Cloudy SLUMP (in.) (ASTM C -143) : 4.75
Paving: 50 Feet north and 5 feet east from west curb on road on west
side of elementary running north from Natches Trace
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 137
7
10/28/97
90000
3183
3000/28 days
CNS 138
28
11/18/97
CNS 139
28
11/18/97
CNS 140
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31 Testing ASTM C -143, Types of
Fracture: Z E
Curing: Methods: ASTM C -39 A® B® C D
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B
SMH /rm
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc.
K A Sparks Contractors, Inc.
City of Coppell - Garreth Campbell
- E. J. Williams (2) SHW Group - Joe Craddock
- Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
�GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT Coppell ISD Report Date: October 29, 1997
PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094
SAMPLE DATE: October 21, 1997
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C -1064)
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group
496103
CONCRETE SUPPLIER:
Pioneer
57
PLANT /TRUCK:
74/826
75
MIX ID NUMBER:
9351
6:55
AIR ( %) (ASTM C -231)
LOAD
7:40
WATER ADDED (gal):
20
Cloudy
SLUMP (in.) (ASTM C -143) :
5
Paving,
east road going north from Natches Trace
approximately 125
feet north from Natches west side of road
10/28/97
CONCRETE CYLINDER! COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
REQUIRED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CNS 133
7
10/28/97
95000
3360
3000/28 days
CNS 134
28
11/18/97
CNS 135
28
11/18/97
CNS 136
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
$ ASTM C -31
ASTM C-1 43, Types of
Z 0
Curing:
M Testing
ethods: ASTM C -39 Fracture: A® B C D
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore