Loading...
SC-Coppell MSN-LR 971027FUGRO- McCLELLAND (SOUTHWEST), INC. FIELD DENSITY REPORT 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 CLIENT: Coppell ISD REPORT DATE: October 27, 1997 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO.: 0771 -2094 DATE PERFORMED: October 22, 1997 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark brown silty clay with organics (lime treated) 99.1 18.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 204 1 Parking lot at northwest corner, 50 feet 94.2 21.4 95.0 west and 50 feet south of northeast corner of parking, final 205 1 Northwest parking, 50 feet east, 50 feet 97.9 21.0 98.8 south of northwest corner of parking, final 206 1 Northwest parking, 75 feet east, 100 feet 98.2 19.4 99.1 south of northwest corner of parking, final 207 1 Northwest parking, 20 feet east, 125 feet 99.5 20.2 100.4 south of northwest corner of parking, final 208 1 Northwest parking, 225 feet south, 50 feet 100.3 19.6 101.2 west of northeast parking, final 209 1 Northwest parking, 15 feet west, 50 feet 95.4 21.6 96.2 north of Dock area, final 210 1 Northwest parking area, 50 feet west, 175 99.8 18.7 100.7 feet south of northeast parking, final Remarks: All densities meet project specifications unless otherwise noted. Jose Rivera Fugro - McClelland Technician SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. - E. J. Williams (2) K A Sparks Contractors, Inc. - Jim Schooler FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: City of Coppell - Garreth Campbell SHW Group - Joe Craddock SHW Group - Mike Elmore �GRO ■ FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 27, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE: October 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks (Cortez) 523392 CONCRETE SUPPLIER: Pioneer 56 PLANT/TRUCK: 27/648 70 MIX ID NUMBER: 9351 COMPRESSIVE AIR ( %) (ASTM C -231) : 5 4:15 pm WATER ADDED (gal): 10 Clear SLUMP (in.) (ASTM c -143) : 5 Paving: Northwest parking lot REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By' SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER NUMBER AGE (days) DATE TESTED LOAD (pounds) STRENGTH (psi) STRENGTH (psi) CNS 117 7 10/24/97 120000 4244 3000/28 days CNS 118 28 11/14/97 CNS 119 28 11/14/97 CNS 120 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & Curing: ASTM C -31 Testing ASTM C -143, :Types of Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By' SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. M ■ w S 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 27, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez 523403 CONCRETE SUPPLIER: Pioneer 56 PLANT /TRUCK: 27/653 70 MIX ID NUMBER: 9351 AGE AIR ( %) (ASTM C -231) : 4.5 5:30 am WATER ADDED (gal): 10 Clear SLUMP (in.) (ASTM c -143) : 5 Paving, west central parking lot elementary school CNS 121 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 121 7 10/24/97 130000 4598 3000/28 days CNS 122 28 11/14/97 CNS 123 28 11/14/97 CNS 124 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 i Testing ASTM C -143, Types of Z Curing: Methods: ASTM C -39 Fracture: A® B® c D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked thy: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore G FUGRO-McCLELLAND (SOUTHWEST), INC. --- 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 27, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 17, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez 523414 CONCRETE SUPPLIER: Pioneer 57 PLANT /TRUCK: 27/758 71 MIX ID NUMBER: 9351 6:10 am AIR ( %) (ASTM C -231) : 4.3 6:45 am WATER ADDED (gal): 10 Clear SLUMP (in.) (ASTM c -143) : 5.5 Paving: Parking lot driveway Southwest corner of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 125 7 10/24/97 117000 4138 3000/28 days CNS 126 28 11/14/97 CNS 127 28 11/14/97 CNS 128 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By. SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 27, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 17, 199? CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez 523441 CONCRETE SUPPLIER: Pioneer 65 PLANT /TRUCK: 271 75 MIX ID NUMBER: 9351 9:00 am AIR ( %) (ASTM C -231) : 5.3 10:00 am WATER ADDED (gal): 20 Clear SLUMP (in.) (ASTM C -143) : 6 Paving: Approach south driveway and north driveway CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 129 7 10/24/97 95000 3360 3000/28 days CNS 130 28 11/14/97 CNS 131 28 11/14/97 CNS 132 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Z Curing: Methods: ASTM C -39 A® B® C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B1 Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUT HWEST), INC. GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE: October 27, 1997 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094 DATE PERFORMED: October 21, 1997' Contractors On Site: K. A. Sparks Contractors Inc. Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below: 1 2 3 4 5 6 LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing Location 1 3/4" Sieve #4 Sieve Northwest corner of northwest parking 100 65 area 100 feet south from northwest corner area 200 feet south from northwest corner area 300 feet south from northwest corner area 100 feet east and 100 feet south from northwest corner area 250 feet south and 100 feet east from northwest corner area Project Requirements: SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve 100 100 100 100 100 Minimum 100% 65 64 64 66 63 Minimum 60% Scott Rogers Fugro- McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: l SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore . �� FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE: October 27 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094 DATE PERFORMED: October 21, 1997 General Contractor: K. A. Sparks Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: 3 Drives or approaching 2, from Natches Trace to parking area and 1 connecting 2 parking areas at north end. 7:15 A.M. 12:45 P.M. 370 4.75-5.0 3 -5 Pioneer - 74 71 -75 °F 3000/28 16 No Scott Rogers Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore