Loading...
SC-Coppell MSN-LR 971024FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 24, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project NO.: 0771 -2094 SAMPLE DATE: October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 495886 CONCRETE SUPPLIER: Pioneer 73 PLANT /TRUCK: 74/734 85 MIX ID NUMBER: 9351 11:12 am AIR ( %) (ASTM C -231) : 4.8 12:05 pm WATER ADDED (gal): 5 Clear SLUMP (in.) (ASTM C -143) : 5 Paving: South parking lot behind school (south of parking lot) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 109 7 10/23/97 83000 2935 3000/28 days CNS 110 28 11/13/97 CNS 111 28 11/13/97 CNS 112 Hold Fracture mode is (A) unless otherwise noted Specifications: Making 8 ASTM C -31 ® ® Curi Methods: ASTM C -39 Fractu e A B C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By. 1 SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 0 N 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 24, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 495907 CONCRETE SUPPLIER: Pioneer 77 PLANT /TRUCK: 74/493 84 MIX ID NUMBER: 9351 1:20 pm AIR ( %) (ASTM C -231) : 5 2:15 pm WATER ADDED (gal): 30 Clear SLUMP (in.) (ASTM c -143) : 5.5 Center (north) strip of elementary parking pavement CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER da s TESTED (pounds) (psi) (psi) CNS 105 7 10/23/97 90000 3183 3000/28 days CNS 106 28 11/13/97 CNS 107 28 11/13/97 CNS 108 Hold Fracture mode is (A) unless otherwise noted Specifications: I Making & ASTM C -31 Testing ASTM C- 143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore 0 of FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 24, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 495854 CONCRETE SUPPLIER: Pioneer 54 PLANT /TRUCK: 74/562 70 MIX ID NUMBER: 9351 6:50 am AIR ( %) ( ASTM C -231) : 4.7 8:15 am WATER ADDED (gal): 5 Clear SLUMP (in.) (ASTM C -143) : 4 Parking lot paving, 18 foot neck of future public road east of parking lot behind elementary school CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 97 7 10/23/97 85000 3006 3000/28 days CNS 98 28 11/13/97 CNS 99 28 11/13/97 CNS 100 Hold Fracture mode is (A) unless otherwise noted Specifications: Making 8 ASTM C -31 t Testing ASTM C -143, Types of ® ® Curing: Methods: ASTM C -39 Fracture: A IS C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B SMH /rm Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUT HWEST), INC. :332� � GRiD 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 24, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 495921 CONCRETE SUPPLIER: Pioneer 79 PLANT /TRUCK: 74 85 MIX ID NUMBER: 9351 2 :23 pm AIR ( % ) (ASTM C -231) : 4.7 3:40 pm WATER ADDED (gal): 20 Clear SLUMP (in.) (ASTM C -143) : 5.5 Paving: Northeast entrance of parking lot CNS 113 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28:27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 113 7 10/23/97 85000 3006 3000/28 days CNS 114 28 11/13/97 CNS 115 28 11/13/97 CNS 116 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C- 143, Types of ® [I Curing: Methods: ASTM C -39 Fracture: A B C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWE INC. -- ruGRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 24, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 16, 1997 CONTRACTOR: Tiseo Paving TICKET NO.: CONCRETE SUPPLIER: Tiseo AMBIENT TEMP. (°F): 53 PLANT /TRUCK: 1/118 CONCRETE TEMP. ( °F) (ASTM C- 1064): 72 MIX ID NUMBER: 34 TIME BATCHED: 7:15 am AIR ( %) (ASTM C -231) : 5.2 TIME SAMPLED: 8:35 am WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (in.) (ASTM C -143) : 4.25 LOCATION OF PLACEMENT: Paving: Perimeter Road westbound lane, 370 feet east of Denton Tap CNS 91 28 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 89 7 10/23/97 145000 5129 3000/28 days CNS 90 28 11/13/97 CNS 91 28 11/13/97 CNS 92 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® Z Curing: Methods: ASTM C -39 B® C D REMARKS: Technician: Jason Brimingham FUGRO- MCCLELLAND (SOUTHWEST), INC. Checked B SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTH INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date: October 24, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE: October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Tiseo Paving 523340 CONCRETE SUPPLIER: Pioneer 65 PLANT /TRUCK: 27-0 76 MIX ID NUMBER: 9351 AGE AIR ( %) (ASTM C -231) : 5.2 10:05 am WATER ADDED (gal): 0 Clear SLUMP (in .) (ASTM C -143) : 5 Paving: Perimeter Road westbound lane, 100 feet east of Denton Tap CNS 93 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 93 7 10/23/97 105000 3714 3000/28 days CNS 94 28 11/13/97 CNS 95 28 11/13/97 CNS 96 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® IS C D REMARKS: Technician: Jason Brimingham FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B ---�-- SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore �iGRO FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 24, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE October 16, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 495868 CONCRETE SUPPLIER: Pioneer 65 PLANT /TRUCK: 74/385 72 MIX ID NUMBER: 9351 8:55 am AIR ( % ) (ASTM C -231) : 5 10:00 am WATER ADDED (gal): 20 Clear SLUMP (in.) (ASTM c -143) : 5 Paving, east central of parking lot behind elementary school CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 101 7 10/23/97 83000 2935 3000/28 days CNS 102 28 11/13/97 CNS 103 28 11/13/97 CNS 104 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 ' Fracture: A® B® C D REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore