SC-Coppell MSN-LR 971022Raw=
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: October 22,1 997
PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
DATE PERFORMED Octo '16, 199T
General Contractor: K. A. Sparks
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Elementary School parking lot
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Jason Brimingham
Fugro - McClelland Technician
7:30 A. M.
4:00 P.M.
500
5
4 -6
Pioneer
80 °F
3000/28
16
No
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: -- '
SMH /mv City of Coppell - Garreth Campbell
Distribution: Coppell ISD - Mickey Harper ty pp
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: October 22, 1997
PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO: 0771 -2094
DATE PERFORMED: October 17;,1997''
General Contractor: K. A. Sparks
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the West parking lot (Elementary School) and driveway
following location: going to Middle School
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Daniel Myers
Fugro - McClelland Technician
4:00 A.M.
11:00 P.M.
400
5-6
3 -5
Pioneer
70 °F
3000/28
16
No
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /mv City of Coppell - Garreth Campbell
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
�. -•
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: October 22 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094
DATE PERFORMED: October 15, 199
General Contractor: K. A. Sparks
Method of Test Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Paving, s Perimeter Road, omes of perimeter road 200
following location: feet
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Jason Brimingham
Fugro - McClelland Technician
7:25 A.M.
3:05 P.M.
425
3.0-5.0
5
Pioneer / 74 and 27
63 -78 °F
3000/28
16
No
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore
�GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT Coppell ISD REPORT DATE: October 22, 1997
PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094
DATE PERFORMED: October 16, 1997
General Contractor: K. A. Sparks
Method of Test Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the of Paving, slab o Denton Tapn grade, Perimeter Road, 400 feet east
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Jason Brimingham
Fugro- McClelland Technician
7:25 A.M.
11:55 A.M.
171
3.5 -5.0
5
Pioneer and Tiseo Plants
72 -77 °F
3000/28
8
No
FUGRO McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /mv City of Coppell - Garreth Campbell
Distribution: Coppell ISD - Mickey Harper
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore