Loading...
SC-Coppell MSN-LR 9710150 FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522287 CONCRETE SUPPLIER: Pioneer 85 PLANT /TRUCK: 27 91 MIX ID NUMBER: 9351 11:30 am AIR ( %) (ASTM C -231) LOAD 12:15 pm WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C -143) : 5 Paving: Perimeter Road, station 19 +90 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 41 7 10/08/97 85000 3007 3000/28 days CNS 42 28 10/29/97 CNS 43 28 10/29/97 CNS 44 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 0 Curing: Methods: ASTM C -39 Fracture: A® BE c D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. M E 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522295 CONCRETE SUPPLIER: Pioneer 85 PLANT /TRUCK: 27 92 MIX ID NUMBER: 9351 12:10 pm AIR ( %) (ASTM C -231) : 5.2 12:34 pm WATER ADDED (gal): 10 Partly cloudy SLUMP (in.) (ASTM C -143) : 5 Paving: Perimeter Road, station 20 +50 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 61' x 12 11 , 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 45 7 10/08/97 100500 3555 3000/28 days CNS 46 28 10/29/97 CNS 47 28 10/29/97 CNS 48 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Z 0 Curing: :Methods: ASTM C -39 A® B® C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore 0 of FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522344 CONCRETE SUPPLIER: Pioneer 90 PLANT /TRUCK: 27/0 94 MIX ID NUMBER: 9351 4:00 pm AIR ( %) (ASTM C -231) : 5.5 4:45 pm WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 5.0 Paving: Perimeter Road, station 25 +20 CNS 69 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 69 7 10/08/97 112500 3979 3000/28 days CNS 70 28 10/29/97 CNS 71 28 10/29/97 CNS 72 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: a Curing: i Methods: ASTM C -39 A® B® C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISO Report Date: October 15, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522335 CONCRETE SUPPLIER: Pioneer 86 PLANT /TRUCK: 27/486 93 MIX ID NUMBER: 9351 3:30 pm AIR ( %) (ASTM c -231) : 5.9 4:10 pm WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 3.50 Paving: Perimeter Road, station 24 +30 CNS 65 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 "x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 65 7 10/08/97 126000 4457 3000/28 days CNS 66 28 10/29/97 CNS 67 28 10/29/97 CNS 68 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of I Curing: Methods: ASTM C -39 Fracture: A® BE C D REMARKS: Technician: Bob Shea FUGRO-MCCLELLAND (SOUTHWEST), INC. Checked By: SMH1rm Distribution: Coppell ISO - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore N FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1,_1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522331 CONCRETE SUPPLIER: Pioneer 86 PLANT /TRUCK: 27 94 MIX ID NUMBER: 9351 3:00 pm AIR ( %) (ASTM C -231) LOAD 3:35 pm WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C -143) : 4 Paving: Perimeter Road, station 23 +85 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 "'x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 61 7 10/08/97 100000 3537 3000/28 days CNS 62 28 10/29/97 CNS 63 28 10/29/97 CNS 64 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 :` Testing ASTM C -143, Types of Z Curing: i Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Bob Shea FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. --� 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date October 15, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522303 CONCRETE SUPPLIER: Pioneer 85 PLANT /TRUCK: 27 92 MIX ID NUMBER: 9351 12:30 pm AIR ( % ) (ASTM C -231) LOAD 1:15 pm WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C -143) : 4 Paving: Perimeter Road, station 21 +40 (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 49 7 10/08/97 124000 4386 3000/28 days CNS 50 28 10/29/97 CNS 51 28 10/29/97 CNS 52 Hold Fracture mode is (A) unless otherwise noted Specifications: :Making & ASTM C -31 i :Testing ASTM C -143, Types of 0 Curing: Methods: ASTM C -39 i Fracture: A® B C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522315 CONCRETE SUPPLIER: Pioneer 86 PLANT /TRUCK: 27 93 MIX ID NUMBER: 9351 1:35 pm AIR ( %) (ASTM C -231) LOAD 2:15 pm WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C -143) : 3.50 paving: Perimeter Road, station 22 +45 CNS 53 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 53 7 10/08/97 107000 3785 3000128 days CNS 54 28 10/29/97 CNS 55 28 10/29/97 CNS 56 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C- 143, '• Types of ® ® Curing: Methods: ASTM C -39 '. Fracture: A IS C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore G FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522265 CONCRETE SUPPLIER: Pioneer 81 PLANT /TRUCK: 27/549 89 MIX ID NUMBER: 9351 8:10 am AIR ( %) (ASTM C -231) : 5.7 9:00 am WATER ADDED (gal): 0 Overcast SLUMP (in.) (ASTM C -143) : 4.50 Paving: Perimeter Road, station 1 +00 CNS 33 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 33 7 10/08/97 122000 4316 3000/28 days CNS 34 28 10/29/97 CNS 35 28 10/29/97 CNS 36 Hold Fracture mode is (A) unless otherwise noted Specifications: I Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: Curing: Methods: ASTM C -39 A® B® C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: October 1, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522318 CONCRETE SUPPLIER: Pioneer 86 PLANT /TRUCK: 27/278 92 MIX ID NUMBER: 9351 2:05 pm AIR ( %) (ASTM C -231) : 5.5 2:45 pm WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C -143) : 4 Paving: Perimeter Road, station 23 +00 (psi) CONCRETE CYLINDER COMPRESSIVE' STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 57 7 10/08/97 103500 3661 3000/28 days CNS 58 28 10/09/97 CNS 59 28 10/09/97 CNS 60 Hold Fracture mode is (A) unless otherwise noted Specifications: & ASTM C -31 Curing Methods: ASTM C -39 I Fractu of A ® B ® C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooler SHW Group - Mike Elmore GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 15, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE:' October - 4 : 1997 '..' CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks Contractors, Inc. 522270 CONCRETE SUPPLIER: Pioneer 80 PLANT/TRUCK: 27 90 MIX ID NUMBER: 9351 9:50 am AIR ( %) (ASTM C -231) : 5.50 10:40 am WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C -143) : 3.50 Paving: Station 18 +90, Perimeter Road (psi) CONCRETE CYLINDER COMPRESSIVE' STRENGTH TESTS Standard 6" x 12 ",!28.27 square.'' inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 37 7 10/08/97 126000 4457 3000/28 days CNS 38 28 10/29/97 CNS 39 28 10/29/97 CNS 40 Hold Fracture mode is (A) unless otherwise noted Specifications: Making 8 ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® BE C D REMARKS: Technician: Bob Shea FUGRO- MCCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore