Loading...
SC-Coppell MSN-LR 971012FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 12, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project No.: 0771 -2094 SAMPLE DATE: September 30 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 491862 CONCRETE SUPPLIER: Pioneer 75 PLANT /TRUCK: 74/829 86 MIX ID NUMBER: 9339 8:15 AIR ( %) ( ASTM C -231) : 5.5 9:00 WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 43/4 Fire lane approximately 150 feet south, 100 feet west of southwest corner of building CONCRETE' CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 13 7 10/07/97 72000 2546 3000/28 days CNS 14 28 10/28/97 CNS 15 28 10/28/97 CNS 16 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, i Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Burl Cooper FUGRO- MCCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWE INC. N G 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date: October 12, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE: Sep tember 30, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 491853 CONCRETE SUPPLIER: Pioneer 76 PLANT /TRUCK: 74/525 86 MIX ID NUMBER: 9339 7:04 AIR ( %) (ASTM C -231) : 5.5 8:05 WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 5 Fire lane approximately 200 feet south, 150 feet west of southwest corner of building CNS 9 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 9 7 10/07/97 70000 2476 3000/28 days CNS 10 28 10/28/97 CNS 11 28 10/28/97 CNS 12 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Z 0 Curing: Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By:_� SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore E 3 w W FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 12, 1997 PROJECT: Coppell Middle School North Sitework Coppell, Texas Project NO.: 0771 -2094 SAMPLE DATE: September 30, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 491867 CONCRETE SUPPLIER: Pioneer 78 PLANT /TRUCK: 74/385 85 MIX ID NUMBER: 9339 8:30 AIR ( %) (ASTM C -231) : 5 9:45 WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTM C -143) : 41/2 Fire lane approximately 75 feet south, 50 feet west of southwest corner of building 7 10/07/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 25 7 10/07/97 98000 3466 3000/28 days CNS 26 28 10/28/97 CNS 27 28 10/28/97 CNS 28 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® D i Curing: Methods: ASTM C -39 BE C REMARKS: Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOU THWEST), INC. �faRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Copped ISD Report Date: October 12, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project No .: 0771 -2094 SAMPLE DATE: ''September 30, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 491850 CONCRETE SUPPLIER: Pioneer 74 PLANT /TRUCK: 74/384 86 MIX ID NUMBER: 9339 6:30 AIR ( % ) (ASTM C -231) : 5.0 7:00 WATER ADDED (gal): 5 Clear SLUMP (in.) (ASTM C -143) : 5 Fire lane southwest parking area approximately 150 feet south, 100 feet west of southwest corner of building 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 17 7 10/07/97 87000 3077 3000/28 days CNS 18 28 10/28/97 CNS 19 28 10/28/97 CNS 20 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: a I Curing: Methods: ASTM C -39 A® B C D REMARKS: Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore GRO FUGRO- McCLELLAND (SOUTHWEST), INC. --� 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date: October 12, 1997 PROJECT Coppell Middle School North Sitework Coppell, Texas Project NO.: 0771 -2094 SAMPLE DATE: September 30, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 491878 CONCRETE SUPPLIER: Pioneer 80 PLANT /TRUCK: 74/499 87 MIX ID NUMBER: 9339 10:21 am AIR ( %) (ASTM C -231) : 5.0 11:30 am WATER ADDED (gal): 0 Clear SLUMP (in .) (ASTM C -143) : 5 Fire lane approximately 300 feet south, 100 feet west of southwest corner of building (pounds) (psi) REMARKS: Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: 2n SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CNS 29 7 10/07/97 91000 3218 3000/28 days CNS 30 28 10/28197 CNS 31 28 10/28/97 CNS 32 1 Hold Fracture mode is (A) unless otherwise noted Specifications: i Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: 2n SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore