Loading...
SC-Coppell MSN-LR 971009FUGRO- McCLELLAND (SOUTHW INC. — fun== 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD REPORT DATE: October 9 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO .: 0771 -2094 DATE PERFORMED: September 27, '1997 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark brown silty clay with organics (lime treated) 99.1 18.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY NO. NO. WEIGHT 201 1 Paving subgrade, South of Elementary 96.4 School, 150 feet south of center of building, final 202 1 Paving subgrade, South of Elementary 99.0 School, 120 feet south of southwest of building, final 203 1 Paving subgrade, South of Elementary 96.7 School, 175 feet south of southeast of building, final Remarks: All densities meet project specifications unless otherwise noted. Jason Brimingham Fugro - McClelland Technician SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. - E. J. Williams (2) K A Sparks Contractors, Inc. - Jim Schooler MOISTURE PERCENT OF CONTENT PERCENT MAXIMUM DENSITY 18.8 97.3 19.0 99.9 18.3 97.6 FUGRO McCLELLAND (SOUTHWEST), INC. Checked by: City of Coppell - Garreth Campbell SHW Group - Joe Craddock SHW Group - Mike Elmore � �M FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE: October 9 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO : 0771 -2094 DATE PERFORMED: Sept 26, 1997 1 Contractors on Site: K. A. Sparks Contractors Inc. Remarks Pulverization /Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing Location 1 3/4" Sieve #4 Sieve 1 Staff parking lot, south approach 100 62 2 Staff parking lot, west side, centerline 100 68 3 Staff parking lot, east side, centerline 100 72 Project Requirements: Minimum 100% Minimum 60% SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve Bob Shea Fugro - McClelland Technician FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By �= SMH /mv City of Coppell - Garreth Campbell Distribution: Coppell ISD - Mickey Harper pp SHW Group -Joe Craddock K A Sparks Contractors, Inc. - E. J. Williams (2) K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore