Loading...
SC-Coppell MSN-LR 971007FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date October 7, 1997 PROJECT Coppell Middle School North, Coppell, Texas Project No .: 0771 -2091 S AMPLE DATE: September 24, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A Sparks Contractors, Inc. 491084 CONCRETE SUPPLIER: Pioneer 77 PLANT /TRUCK: 74/742 88 MIX ID NUMBER: 9351 9:25 am AIR ( % ) (ASTM C -231) LOAD (pounds) 11:00 am WATER ADDED (gal): 35 Overcast SLUMP (in.) (ASTM C -143) : 4.50 Parking lot paving, southwest approach to parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER NUMBER AGE (days DATE TESTED LOAD (pounds) STRENGTH (psi) STRENGTH (Psi) CMN 399 7 10/01/97 96000 3395 4000/28 days CMN 400 28 10/22/97 CMN 401 28 10122/97 CMN 402 Hold Specifications: i Making & ASTM C -31 Curing: Fracture mode is (A) unless otherwise noted Testing ASTM C -143, :Types of Methods: ASTM C -39 i Fracture: A® B® C D REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore 0 FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 7, 1997 PROJECT: Coppell Middle School North, Coppell, Texas Project No.: 0771 -2091 SAMPLE DATE: September 24,1997 CONTRACTOR: K. A. Sparks TICKET NO.: 491090 CONCRETE SUPPLIER: Pioneer AMBIENT TEMP. (°F): 78 PLANT /TRUCK: 74/567 CONCRETE TEMP. ( °F) (ASTM C- 1064): 89 MIX ID NUMBER: 9351 TIME BATCHED: 10:00 am AIR ( %) (ASTM C -231) : (psi) TIME SAMPLED: 10:50 am WATER ADDED (gal): 10 WEATHER CONDITION: Overcast SLUMP (in.) (ASTM C -143) : 5.25 LOCATION OF PLACEMENT: Parking lot paving, 125 feet east of school, 50 feet north of southwest corner 28 10/22/97 CONCRETE CYLINDER COMPRESSIVE'' STRENGTH TESTS Standard 6 ",z 12 " 28.27 square' inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMN 403 7 10/01/97 99000 3501 4000/28 days CMN 404 28 10/22/97 CMN 405 28 10/22/97 CMN 406 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, i Types of Curing: Methods: ASTM C -39 Fracture: A® B® C O REMARKS: Technician: Bob Shea FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: y ✓ %i SMH /rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD REPORT DATE: October 7, 1997 PROJECT: Coppell Middle School North Sitework, Coppell, Texas PROJECT NO.: 0771 -2094 DATE PERFORMED: September 25, '1997 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark gray and brown silty clay with organics 107.6 17.7 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 197 1 12 inch roof drain, Line C, station 15 +24, 103.2 18.3 95.9 2 feet below grade 198 1 12 inch roof drain, Line C, station 10 +50, 104.4 17.8 97.0 1 foot below grade 199 1 12 inch roof drain, Line C, station 8 +00, 2 105.3 18.0 97.9 feet below grade 200 1 12 inch roof drain, Line C, station 5 +00, 1 104.4 18.6 97.0 foot below grade Remarks: All densities meet project specifications unless otherwise noted. Burl Cooper Fugro - McClelland Technician SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. - E. J. Williams (2) K A Sparks Contractors, Inc. - Jim Schooler FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: City of Coppell - Garreth Campbell SHW Group - Joe Craddock SHW Group - Mike Elmore TV. ao FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT Coppell ISD REPORT DATE: October 7 1997 PROJECT Coppell Middle School North Sitework, Coppell, Texas PROJECT NO .: 0771 -2094 DATE PERFORMED: September 24, 1997 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark brown silty clay with organics (lime treated) 99.1 18.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 188 1 Natches Trace, station 0 +50, 1st lift 97.7 20.2 98.6 189 1 Natches Trace, station 0 +50, 2nd lift 95.1 22.6 96.0 190 1 Southwest Elementary P.A. approximately 99.6 20.4 100.5 250 feet south, 200 feet west of southwest corner of building, final 191 1 Southwest Elementary P.A. approximately 96.7 22.8 97.6 200 feet south, 180 feet west of southwest corner of building, final 192 1 Fire lane approximately 30 feet south, 25 99.7 21.4 100.6 feet west of Natches Trace, final 193 1 Fire lane approximately 60 feet south, 50 95.9 22.2 96.8 feet west of southwest corner of building, final 194 1 Southwest Elementary P.A. approximately 96.7 23.0 97.6 150 feet south, 100 feet west of southwest corner of building, final 195 1 Southwest Elementary P.A. approximately 98.0 20.9 98.9 100 feet south, 50 feet west of southwest corner of building, final 196 1 Fire lane approximately 50 feet south, 30 96.5 20.7 97.4 feet west southwest corner of building, final Remarks: All densities meet project specifications unless otherwise noted. Burl Cooper Fugro - McClelland Technician FUGRO McCLELLAND (SOUTHWEST), INC. Checked by: . '� SMH /mv Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. - E. J. Williams (2) K A Sparks Contractors, Inc. - Jim Schooler City of Coppell - Garreth Campbell v SHW Group - Joe Craddock SHW Group - Mike Elmore