Loading...
SC-Coppell MSN-LR 971006��s FUGRO- McCLELLAND (SOUTHWEST), INC. — � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT Coppell ISD REPORT DATE: October 6 1997 PROJECT Coppell Middle School North, Coppell, Texas PROJECT NO: 0771 -2091 DATE PERFORMED: September 23, 1997 Contractors on Site: Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing Location 1 3/4" Sieve #4 Sieve 1 Circle park lot, north 100 68 2 Circle park lot, south 100 70 3 Circle park lot, east 100 72 4 Circle park lot, west 100 68 5 Street on west side of Circle Park Lot 100 67 Project Requirements: Minimum 100% Minimum 60% SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve Pat Nichols Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore