SC-Coppell MSN-LR 971006��s
FUGRO- McCLELLAND (SOUTHWEST), INC. — �
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
LIME STABILIZED SOIL PULVERIZATION REPORT
CLIENT Coppell ISD REPORT DATE: October 6 1997
PROJECT Coppell Middle School North, Coppell, Texas PROJECT NO: 0771 -2091
DATE PERFORMED: September 23, 1997
Contractors on Site:
Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below:
LIME STABILIZED SOIL PULVERIZATION TEST RESULTS
Percent Passing
Percent Passing
Location
1 3/4" Sieve
#4 Sieve
1 Circle park lot, north
100
68
2 Circle park lot, south
100
70
3 Circle park lot, east
100
72
4 Circle park lot, west
100
68
5 Street on west side of Circle Park Lot
100
67
Project Requirements:
Minimum 100%
Minimum 60%
SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve
SDHPT Item 260.4 (1982) 3/4" Sieve
Pat Nichols
Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore