Loading...
SC-Coppell MSN-LR 970930— fu'GRO ■ FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE: September 30, 1997 PROJECT: Coppell Middle School North, Coppell, Texas PROJECT NO: 0771 -2091 DATE PERFORMED: September 24, 1997 General Contractor: K A Sparks Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Paving - Parking lot east side following location: Time placement began: 6:00 A.M. Time placement ended: 1:30 P.M. Total cubic yards placed: 400 Slump range (inches): 4 -6 Slump required (inches): 5.0 Concrete supplier and plant: Pioneer Concrete temperature range ( °F): 85 -93 °F Strength required (psi /days): 4000/28 Number of cylinders made: 32 Superplasticizer used: No Bob Shea Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /mv Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore