SC-Coppell MSN-LR 970930— fu'GRO
■
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell ISD REPORT DATE: September 30, 1997
PROJECT: Coppell Middle School North, Coppell, Texas PROJECT NO: 0771 -2091
DATE PERFORMED: September 24, 1997
General Contractor: K A Sparks
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Paving - Parking lot east side
following location:
Time placement began:
6:00 A.M.
Time placement ended:
1:30 P.M.
Total cubic yards placed:
400
Slump range (inches):
4 -6
Slump required (inches):
5.0
Concrete supplier and plant:
Pioneer
Concrete temperature range ( °F):
85 -93 °F
Strength required (psi /days):
4000/28
Number of cylinders made:
32
Superplasticizer used:
No
Bob Shea
Fugro - McClelland Technician
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /mv
Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock
K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore