Loading...
SC-Coppell MSN-LR 970915. ��� G FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date September 15, 1997 PROJECT: Coppell Elementary School #10, Coppell, Texas Project No .: 0771 -2089 SAMPLE DATE: August 13, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Fox Contractors 141013 CONCRETE SUPPLIER: Go Crete 78 PLANTITRUCK: 3 -185 87 MIX ID NUMBER: 263 6:57 a.m AIR ( % ) (ASTM C -231) : 5.5 7:30 a.m WATER ADDED (gal): 10 Clear SLUMP (in.) (ASTM C -143) : 51/4 Parking, 105 feet East 75 feet North of Northeast corner of gymnasium CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CES 273 7 8/20/97 83000 2935 3000/28 days CES 274 28 9/10/97 105000 3714 CES 275 28 9/10/97 103000 3643 CES 276 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 '• Testing ASTM C -143, Types of Fracture: Z Curing: Methods: ASTM C -39 A® B C D REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooler SHW Group - Mike Elmore FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date September 15, 1997 PROJECT Coppell Elementary School #10, Coppell, Texas Project No.: 0771 -2089 SAMPLE DATE: August 13, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C- 1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Fox Contractors 320321 CONCRETE SUPPLIER: Go Crete 90 PLANT/TRUCK: 3 -168 92 MIX ID NUMBER: 263 9:42 a.m AIR ( % ) (ASTM C -231) : LOAD 10:45 a.m WATER ADDED (gal): NUMBER Fair SLUMP (in .) (ASTM C -143) : 5 Northwest parking lot, 60 yards from manhole at Northwest corner of lot (by baseball field) 8/20/97 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CES 277 7 8/20/97 75000 2652 3000/28 days CES 278 28 9/10/97 95000 3360 CES 279 28 9/10/97 97000 3431 CES 280 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of a '. Curing: Methods: ASTM C -39 Fracture: A® B C D REMARKS: Technician: David Williams FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/hb Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams (2) SHW Group - Joe Craddock K A Sparks Contractors, Inc. - Jim Schooier SHW Group - Mike Elmore I an= ■ w �� FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date September 15, 1997 PROJECT: Coppell Elementary School #10, Coppell, Texas Project NO.: 0771 -2089 SAMPLE DATE: August 13, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Fox Contractors 320336 CONCRETE SUPPLIER: Go Crete 92 PLANT/TRUCK: 3 -186 94 MIX ID NUMBER: 263 12:05 p.m AIR ( %) (ASTM C -231) : 1:00 p.m WATER ADDED (gal): Clear SLUMP (in .) (ASTM C -143) : 4.5 Northwest parking lot, 20 yards from manhole at northwest corner of lot (by baseball field) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CES 281 7 8/20/97 80000 2829 3000/28 days CES 282 28 9/10/97 105000 3714 CES 283 28 9/10/97 100000 3537 CES 284 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: David Williams FUGRO- McCLELLAND (SOUTHWEST), INC. Checked 1 3yT SMH /hb Distribution: Coppell ISD - Mickey Harper K A Sparks Contractors, Inc. K A Sparks Contractors, Inc. City of Coppell - Garreth Campbell - E. J. Williams (2) SHW Group - Joe Craddock - Jim Schooier SHW Group - Mike Elmore